NearbyBuildsOttawa

Bilan du développement à Ottawa — mai 2026

17
demandes actives
1 101
logements proposés
0
approbations

En mai 2026, 17 demandes d'aménagement ont été actives dans le processus de demande d'aménagement de la Ville d'Ottawa, totalisant 1 101 logements proposés. Chaque demande renvoie à son document source officiel.

Redevelopment of the site for mixed uses within three towers , ranging in height from 34 storeys to 40 storeys, consisting of residential, commercial and office uses, along with preservation of the Standard Bread Building and 526 underground parking spaces. This revision is related to Phase 1 (Tower A), 402 residential units are now being proposed.
402 logements40 étagesInitial Circulation Period Completed
2026-05-22Réglementation du plan d'implantationdossier D07-12-26-0055
The City of Ottawa has received a Site Plan Control application to construct a new planned unit development consisting of 268 residential units within 13 three-and-a-half-storey stacked dwelling blocks.
268 logements4 étagesInitial Review Comments Sent
2026-05-06Réglementation du plan d'implantationdossier D07-12-26-0049
Affordable housing - 12-storey apartment building with between 124 and 128 units
128 logements12 étagesPériode de commentaires en cours
2026-05-07Modification au Plan officieldossier D01-01-26-0008
Affordable housing - 12-storey apartment building with between 124 and 128 units
128 logements12 étagesPériode de commentaires en cours
2026-05-07Modification au Règlement de zonagedossier D02-02-26-0034
The City of Ottawa has received Official Plan Amendment, Zoning By-law Amendment and Site Plan Control applications to permit a six-storey apartment building containing 52 residential units. A threestorey underground parking garage is proposed to contain 54 vehicle parking spaces and 56 bicycle parking spaces.
52 logements6 étagesDossier de demande en attente
2026-05-08Modification au Plan officieldossier D01-01-26-0010
The City of Ottawa has received Official Plan Amendment, Zoning By-law Amendment and Site Plan Control applications to permit a six-storey apartment building containing 52 residential units. A three storey underground parking garage is proposed to contain 54 vehicle parking spaces and 56 bicycle parking spaces.
52 logements6 étagesDossier de demande en attente
2026-05-08Modification au Règlement de zonagedossier D02-02-26-0037
The City of Ottawa has received Official Plan Amendment, Zoning By-law Amendment and Site Plan Control applications to permit a six-storey apartment building containing 52 residential units. A three storey underground parking garage is proposed to contain 54 vehicle parking spaces and 56 bicycle parking spaces.
52 logements6 étagesDossier de demande en attente
2026-05-08Réglementation du plan d'implantationdossier D07-12-26-0051
The owner is proposing to build a 4-storey apartment building with 19 units in it. Two parking spaces are proposed under the cantilever of floors 2 to 4. 10 bicycle parking spaces are proposed.
19 logements4 étagesOn Circulation; Initial Submission Review
2026-05-05Réglementation du plan d'implantationdossier D07-12-26-0047
The City of Ottawa has received a Zoning By-law Amendment application to increase the maximum gross floor area from 300 square metres to 1,000 square metres for a proposed "medical facility" use.
Councillor Concurs
2026-05-25Modification au Règlement de zonagedossier D02-02-26-0043
Heritage Permit Issued
2026-05-22Loi sur le patrimoine de l'Ontariodossier D09-04-26-0028
The City of Ottawa has received a Zoning By-law Amendment application to rezone to Residential (R4UC) under Zoning By-law 2008-250 and Neighbourhood (N4C) under Zoning By-law 2026-50. Site-specific exceptions are requested to permit a maximum building height of 12m and a reduction in long-term bicycle parking.
Période de commentaires en cours
2026-05-19Modification au Règlement de zonagedossier D02-02-26-0041
Motion from Council for City initiated minor rezoning to add day care as a permitted use.
Initial Circulation Period Completed
2026-05-13Modification au Règlement de zonagedossier D02-02-26-0040
To rezone the subject site from Rural countryside (RU) to Rural Commercial (RC) to permit future commercial and light industrial use on the subject site. A portion of the site containing a provincially significant wetland is proposed to be rezoned to Open Space, Subzone R (O1R).
Période de commentaires en cours
2026-05-13Modification au Règlement de zonagedossier D02-02-26-0039
No development is proposed. The proposed zoning amendment is intended to prohibit residential development on the retained lands of an approved consent for severance. This zoning change is listed as a required condition for the consent to be finalized.
Notice of Public Meeting Sent
2026-05-08Modification au Règlement de zonagedossier D02-02-26-0036
The City of Ottawa has initiated Official Plan and Zoning By-law amendments to amend the Riverside South Secondary Plan and the Zoning By-law to permit a reduced minimum height of a building within 20 metres of the main street and an increased maximum front yard setback for buildings that front onto the main street.
Comment Period has Ended/Issue Resolution
2026-05-07Modification au Règlement de zonagedossier D02-02-26-0035
The City of Ottawa has initiated Official Plan and Zoning By-law amendments to amend the Riverside South Secondary Plan and the Zoning By-law to permit a reduced minimum height of a building within 20 metres of the main street and an increased maximum front yard setback for buildings that front onto the main street.
Période de commentaires en cours
2026-05-07Modification au Plan officieldossier D01-01-26-0009
The City of Ottawa has received Minor Zoning By-law Amendment and Site Plan Control applications for partial redevelopment on site to add a single-storey restaurant and associated drive-through. A total of 17 vehicular parking spaces and 4 bicycle parking spaces are proposed.
1 étagesDossier de demande en attente
2026-05-01Modification au Règlement de zonagedossier D02-02-26-0033

Autres mois

juin 2026 (3)avril 2026 (16)mars 2026 (15)février 2026 (20)janvier 2026 (12)décembre 2025 (26)novembre 2025 (21)octobre 2025 (8)septembre 2025 (14)août 2025 (19)juillet 2025 (19)juin 2025 (20)