2025 Mer-Bleue, Ch De La — projet de développement
Ce projet commercial (plan d'implantation) situé au 2025 Mer-Bleue, Ch De La, dans le quartier Portobello South (district Ward 19), a fait l'objet de 1 demande devant le processus de demande d'aménagement de la Ville d'Ottawa lors de la séance du 2025-04-30. Statut : à l'étude — dernier statut : Signed Letter of Undertaking Received. Type de demande : Site Plan Control.
Historique des demandes (1)
2025-04-30 — Réglementation du plan d'implantation
· Signed Letter of Undertaking Received (D07-12-25-0059)
Existing buildings and development were approved as part of the Phase 1 and 2 site plan approvals for the site. The current proposal represents Phase 3 for the site and was contemplated during the previous approvals. The Phase 3 area is ±18,269.51 m2 and consists of: single retail food store with a GFA of ±3,969.60; 261 parking spaces (includes 1 motorbike space and 8 accessible spaces); 8 bicycle parking spaces; two new private approaches (one from Noella Leclair Way for general traffic and one from Roger Pharand Street for loading vehicles); and, landscaping. A space to the immediate west of the proposed building is reserved for future development.
Autres projets dans Portobello South
A Site Plan Control application to construct a two-storey elementary school with a total floor area of 2,900 square metres. The school will accommodate up to 604 students within the school building and eight portable classrooms. Surface parking for 49 vehicles at the rear of the site will have access from Sweetvalley Drive.
The proposal consists of one 6 storey mixed-use building, containing 121 residential units and 375 m.sq main floor commercial, with underground parking.
A total of 95 residential dwelling units are proposed for the Provence Orleans Phase 5B Subdivision and include 41 detached dwelling units and 54 townhome dwelling units. The rezoning will apply to 10 detached dwelling lots and one townhome block within Phase 5B.
The City of Ottawa has received a Zoning By-law Amendment application to rezone the site from Development Reserve (DR) to Residential Fourth Density Subzone Z (R4Z) to permit a Planned Unit Development (PUD) with two buildings. Each building will be 3-storeys and have 15 units. A PUD needs to obtain Site Plan Control (SPC) Approval, and a SPC application has also been submitted.
Plan of Subdivision, Zoning By-law Amendment
Plan of Subdivision, Zoning By-law Amendment
, Plan of Subdivision
Zoning By-law Amendment, Site Plan Control