2025 Mer-Bleue, Ch De La — development project
This commercial project (site plan control) at 2025 Mer-Bleue, Ch De La, in the Portobello South neighbourhood (Ward 19 district), has been the subject of 1 application before City of Ottawa's development-application process at its 2025-04-30 meeting. Status: under review — latest status: Signed Letter of Undertaking Received. Application type: Site Plan Control.
Filing history (1)
2025-04-30 — Site Plan Control
· Signed Letter of Undertaking Received (D07-12-25-0059)
Existing buildings and development were approved as part of the Phase 1 and 2 site plan approvals for the site. The current proposal represents Phase 3 for the site and was contemplated during the previous approvals. The Phase 3 area is ±18,269.51 m2 and consists of: single retail food store with a GFA of ±3,969.60; 261 parking spaces (includes 1 motorbike space and 8 accessible spaces); 8 bicycle parking spaces; two new private approaches (one from Noella Leclair Way for general traffic and one from Roger Pharand Street for loading vehicles); and, landscaping. A space to the immediate west of the proposed building is reserved for future development.
Other projects in Portobello South
A Site Plan Control application to construct a two-storey elementary school with a total floor area of 2,900 square metres. The school will accommodate up to 604 students within the school building and eight portable classrooms. Surface parking for 49 vehicles at the rear of the site will have access from Sweetvalley Drive.
The proposal consists of one 6 storey mixed-use building, containing 121 residential units and 375 m.sq main floor commercial, with underground parking.
A total of 95 residential dwelling units are proposed for the Provence Orleans Phase 5B Subdivision and include 41 detached dwelling units and 54 townhome dwelling units. The rezoning will apply to 10 detached dwelling lots and one townhome block within Phase 5B.
The City of Ottawa has received a Zoning By-law Amendment application to rezone the site from Development Reserve (DR) to Residential Fourth Density Subzone Z (R4Z) to permit a Planned Unit Development (PUD) with two buildings. Each building will be 3-storeys and have 15 units. A PUD needs to obtain Site Plan Control (SPC) Approval, and a SPC application has also been submitted.
Plan of Subdivision, Zoning By-law Amendment
Plan of Subdivision, Zoning By-law Amendment
, Plan of Subdivision
Zoning By-law Amendment, Site Plan Control