2128 Trim — projet de développement
Ce projet résidentiel (modification de zonage) situé au 2128 Trim, dans le quartier Portobello South (district Ward 19), a fait l'objet de 5 demandes devant le processus de demande d'aménagement de la Ville d'Ottawa entre le 2020-07-09 et le 2025-11-25. Il prévoit 95 logements. Statut : à l'étude — dernier statut : Dossier de demande en attente. Types de demande : Site Plan Control, Plan of Condominium, Zoning By-law Amendment, Plan of Subdivision.
Historique des demandes (5)
2025-11-25 — Modification au Règlement de zonage
· Dossier de demande en attente (D02-02-25-0088)
A total of 95 residential dwelling units are proposed for the Provence Orleans Phase 5B Subdivision and include 41 detached dwelling units and 54 townhome dwelling units. The rezoning will apply to 10 detached dwelling lots and one townhome block within Phase 5B.
2025-02-10 — Plan de lotissement
· Draft Approval Revised/Extended (D07-16-25-0001)
Plan of Subdivision Draft Plan Extension Application for 2128 Trim Road
2024-07-31 — Modification au Règlement de zonage
· Règlement de zonage en vigueur (D02-02-24-0034)
2021-11-19 — Plan de condominium
· Agreement Registered - Final Legal Clearance Given (D07-04-21-0018)
2020-07-09 — Réglementation du plan d'implantation
· Agreement Registered - Final Legal Clearance Given (D07-12-20-0095)
Autres projets dans Portobello South
A Site Plan Control application to construct a two-storey elementary school with a total floor area of 2,900 square metres. The school will accommodate up to 604 students within the school building and eight portable classrooms. Surface parking for 49 vehicles at the rear of the site will have access from Sweetvalley Drive.
The proposal consists of one 6 storey mixed-use building, containing 121 residential units and 375 m.sq main floor commercial, with underground parking.
The City of Ottawa has received a Zoning By-law Amendment application to rezone the site from Development Reserve (DR) to Residential Fourth Density Subzone Z (R4Z) to permit a Planned Unit Development (PUD) with two buildings. Each building will be 3-storeys and have 15 units. A PUD needs to obtain Site Plan Control (SPC) Approval, and a SPC application has also been submitted.
Plan of Subdivision, Zoning By-law Amendment
Plan of Subdivision, Zoning By-law Amendment
, Plan of Subdivision
Zoning By-law Amendment, Site Plan Control
A Site Plan Control application has been received to construct a three-storey high school with approximately 7,873 sq. m of gross floor area. The proposed development will also accommodate a parking lot, a bus loop area, bicycle parking and an area for the future allocation of 12 portable classrooms.