New construction & development in Weir Industrial, Edmonton
21
projects tracked
21
advancing
2025-09-26
latest activity
As of 2025-09-26, 21 development projects have been reviewed by City of Edmonton's building-permit process in the Weir Industrial area. 12 are new builds, and 21 are currently advancing. Use types: 1 commercial.
Recent activity
To construct an addition (vestibule) to an existing Minor Industrial Use building, and construct interior and exterior alterations.
To construct Interior Alterations (new classrooms, ceiling, new bathrooms, mechanical, electrical and sprinkler upgrades) to an existing school building - Alberta Classical Academy Eastgate.
To construct 2 lean-to open air storage structures attached to an existing industrial building EXISTING WITHOUT PERMITS.
To construct a new 2 storey commercial retail building, and tenant fit-up. WHYTE AVE LANDSCAPE SUPPLIES
To construct additions (sheds) and exterior alterations to two Industrial Use buildings. existing without permits.
Projects (21)
To construct an addition (vestibule) to an existing Minor Industrial Use building, and construct interior and exterior alterations.
To construct Interior Alterations (new classrooms, ceiling, new bathrooms, mechanical, electrical and sprinkler upgrades) to an existing school building - Alberta Classical Academy Eastgate.
To construct 2 lean-to open air storage structures attached to an existing industrial building EXISTING WITHOUT PERMITS.
To construct a new 2 storey commercial retail building, and tenant fit-up. WHYTE AVE LANDSCAPE SUPPLIES
To construct additions (sheds) and exterior alterations to two Industrial Use buildings. existing without permits.
To construct a General Industrial Use building (13.41 m x 6.10 m; Unheated Metal Quonset Building * Metal membrane, no fabric film * No Industrial Racking-) --"DEMIR ENGINEERING LTD."-- The seacans need separate permits.
To construct a natural gas telemetry building (unoccupied) --"ATCO Gas & Pipelines"--
To construct a 184' x 60' steel frame fabric covered structure (Quonset 1) for unheated cold storage of low hazard industrial materials only. - Atco NOTE: permit expires September 21, 2027
To construct new gas pump canopy ( 63' x 53') serving a Major Service Station --"Brandon Petroleum Canopy Installation" --
Construct a new utility service building EPCOR Sanitary Sewer Pumping Station New Construction
To construct a General Industrial building (with mezzanine).
To construct 2 General Industrial Use buildings, Buildings 2 and 3 on an existing General Industrial development (Allwest Auto Parts); buildings are existing without permits.
To construct a General Industrial building.
To construct an addition to an existing industrial building ("DFI Pipe Mill", existing without permits).
To construct two additions (East side and South-West Side wings) to a industrial building BUILT WITHOUT PERMITS) - DFI Building.
To construct an addition to an existing General Contractor Services building (expanding existing welding/fabrication shop).
To construct a 12m2 (mechanical equipment room) Accessory Building to a General Industrial Use development (amendment to approved development permit - 188172758-001).
To construct a 329.80m2 addition to a General Industrial Use building and interior alterations.
To construct an Accessory Building - 5.00m x 2.99m Shed.
To construct a General Industrial Use building.(KS Machine fit out + 1 additional shell CRU)
To construct a General Industrial Use building (storage quonset 9.4 m x 15.2m) - Alpha Power Controls Ltd.