7210 42 Street NW — development project
This industrial project (new construction) at 7210 42 Street NW, in the Weir Industrial neighbourhood, has been the subject of 3 applications before City of Edmonton's building-permit process between 2016-07-28 and 2022-09-21. Estimated construction value: $4.0M. Status: advancing — latest status: Issued. Application types: Addition — Commercial Final, New — Commercial Final.
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (3)
2022-09-21 — New — Commercial Final
· Issued (5-442196647)
To construct a 184' x 60' steel frame fabric covered structure (Quonset 1) for unheated cold storage of low hazard industrial materials only. - Atco NOTE: permit expires September 21, 2027
2022-09-21 — New — Commercial Final
· Issued (3-442196647)
To construct a 184' x 60' steel frame fabric covered structure (Quonset 2) for unheated cold storage of low hazard industrial materials only. - Atco NOTE: permit expires September 21, 2027
2016-07-28 — Addition — Commercial Final
· Issued (4-180197218)
To construct an addition to an existing Minor Impact Utility Services building (two storey addition to "ATCO Pipelines Edmonton Centre").
Other projects in Weir Industrial
To construct a new 2 storey commercial retail building, and tenant fit-up. WHYTE AVE LANDSCAPE SUPPLIES
To construct an addition to an existing industrial building ("DFI Pipe Mill", existing without permits).
To construct a natural gas telemetry building (unoccupied) --"ATCO Gas & Pipelines"--
To construct a General Industrial Use building (13.41 m x 6.10 m; Unheated Metal Quonset Building * Metal membrane, no fabric film * No Industrial Racking-) --"DEMIR ENGINEERING LTD."-- The seacans need separate permits.
To construct an Accessory Building - 5.00m x 2.99m Shed.
To construct two additions (East side and South-West Side wings) to a industrial building BUILT WITHOUT PERMITS) - DFI Building.
To construct a General Industrial Use building.(KS Machine fit out + 1 additional shell CRU)
To construct a 329.80m2 addition to a General Industrial Use building and interior alterations.