New construction & development in Downtown, Edmonton
94
projects tracked
2,358
proposed units
94
advancing
2026-05-28
latest activity
As of 2026-05-28, 94 development projects have been reviewed by City of Edmonton's building-permit process in the Downtown area, totalling 2,358 proposed housing units. The largest is a 363-unit mixed-use project at 10722 Jasper Avenue NW. 27 are new builds, and 94 are currently advancing. Use types: 13 residential, 58 commercial, 5 mixed-use, 8 institutional.
Recent activity
To complete the interior renovation of the 3rd, 8th, and 9th floors in the existing office building. --Commerce Place--
To construct new washroom facilities on the existing concrete structure for the Government Services Buildings.
To construct Interior Alterations (convert office/classrooms to student laboratories and support spaces) on the main floor of an existing post-secondary education building (MacEwan University Building 6).
To convert an office building into apartment dwellings and to construct interior alterations. McKenney Apartment
To construct exterior and interior alterations to an existing commercial building (concourse, main and second floors) - ATB Place revitalization.
Projects (94)
To construct a mixed use high building over existing underground parkade (Main - retail shell, residential amenity, 2nd to 36th- 363 dwelling units) - The Parks, building 1.
To construct a mixed use building (285 Dwellings) 5 storey Podium with West MidRise Tower. Mercantile uses on the main floor, 3rd floor Assembly use, renovation and addition to the existing underground parkade and a pedway connection - Station Lands North.
To construct a STRUCTURAL FRAME ONLY for a 56-storey mixed use tower on podium (Hotel/Residence AC Building)
To construct a mixed-use building on an existing parkade/foundation and existing structural frame, main floor: retail (shell only, no demising walls) with common area and leasing office fit up, floors 2 to 30 common area and residential units (240 dwellings) - The Augustana.
To construct an multi-use building (main floor retail, upper floors residential apartments) - Mayfair North.
To construct a 29 Storey Apartment building (240 Dwellings) with amenity space on level 02. Two general retail of SHELL ONLY (cru-1, cru-2) on the main floor and 5 underground parking levels - Falcon Tower One.
To construct a multi-use high building with underground parkade, retail/office/parking: floors 1-4; Residential: floors 6-33. Fox 2 (South Tower).
To change the use of main floor retail stores to eleven (11) new live/work units and construct interior and exterior alterations - Center West.
To change the use of a office tower to a multi use building (with 250 apartment dwellings and construct exterior and interior alterations and shell CRU spaces (General Retail Store in the Basement, 2 Restaurants on the main floor CRU 110: 637m2 of public space with 237 seats and CRU 113: 454m2 of public space with 163 seats), and General Retail Stores and Professional, Financial and Office Support Services on the second floor) - Hyatt House and Hyatt Place. (see also new DP 404910425-002)
To construct Exterior Alterations (pedway & rooftop amenity area) and construct Interior alterations (level 1commercial units & levels 2 to 7 residential units) to an existing commercial building for new rental Apartment Housing units - William's Hall.
To construct exterior and interior alterations (add 33 dwellings (7 main, 13 on 4th and 5th floors) to an existing mixed-use Multi-unit Housing building - 100 House at Financial Building.
To convert an office building into apartment dwellings and to construct interior alterations. McKenney Apartment
To change the use of a portion of a building from office to residential (Group D to C) 24 additional dwellings and to construct interior (create residential suites at floors 2,3,4 &5 AND install a sprinkler system at floors:main, 2,3,4& 5) AND exterior alterations - MacDonald Estates.
To construct interior alterations that convert amenity space on the second floor of the Churchill Building into 18 residential units in an existing residential building - The Churchill Retirement Home.
To construct Exterior Alterations (removing glazing and vestibule doors on main floor) and Interior Alterations (demo all partitions on floors 1,3,34 and 35) to an existing apartment building - Edmonton House. (NOTE: future interior alteration and change of use require a separate permit)
To add 10 Dwellings (7 units on the 5th floor, 3 units on the 19th floor) and to construct interior alterations (P1-P4 new elevator lobby doors, main floor lobby renovations, 4th floor new laundry&amenity rooms, 5th and 19th floor new suites, main floor garbageroom) to an existing Apartment Housing building.
To change the use of the 2nd and 3rd floor office spaces to 8 dwelling units, add an additional dwelling unit on the 32nd floor, and construct interior and exterior alterations to a multi use building - Ultima Condominiums. (Changes to permit 112702204-003)
To amend the scope of work, with omissions and/or departures from the original Building Permit drawings 121459408-002. To remove exterior balconies, pergola canopies over 4th floor balconies, Install structural Guard rails in front of existing sliding doors on 4th floor balconies, exterior cladding (cultured stone/cementitious board), to reinforce grade window well/retaining wall at basement suite # 0004, and to add a Fire Alarm Annunciator Panel at the North Entrance. Broadview Apartments.
To complete the interior renovation of the 3rd, 8th, and 9th floors in the existing office building. --Commerce Place--
To construct new washroom facilities on the existing concrete structure for the Government Services Buildings.
To construct Interior Alterations (convert office/classrooms to student laboratories and support spaces) on the main floor of an existing post-secondary education building (MacEwan University Building 6).
To construct exterior and interior alterations to an existing commercial building (concourse, main and second floors) - ATB Place revitalization.
To change of use from a retail (E) to an office (D) and to construct Interior Alterations ( Adding a interconnected stair ) within an existing commercial building. "National Bank Headquarters Branch"
To construct Interior Alterations (4th floor to create new common areas including lounge, meeting rooms and kitchen. Two barrier free washrooms with showers. Interior alterations to the 5th floor elevator lobby and corridor) to an existing office building
To construct exterior alterations (replacement of EFIS and windows) to an existing building -- Coast Plaza Edmonton Hotel --
To construct Addition of an exterior stair from the 5th floor to the 4th floor podium. CANADIAN WESTERN BANK/MANULIFE PLACE
To construct an 8-storey Public Education Building with a mezzanine, an Accessory Specialty Food Services Use on the main floor, and an underground parkade (parkade Permit) 463071239-041 - MacEwan School of Business. Alternative Solution - Interconnected Floorspace Revised April 14/2025. Moved approved Pedway from permit 463071239-014 to permit 463071239-011
To construct Interior Alteration to an office building, 1st, 6th & 7th floor, 'Indigenous Services Canada', Canada Place,
To construct 2 storey addition and complete interior/exterior alterations to an existing commercial building. - Claire Estates
To complete demolition, and interior renovation of the existing building space - Phase 2, Sir Frederick W. Haultain Building Renovations.
To complete exterior and interior renovation (demolish and reconstruct the roof deck, 4 stairs, waterproofing, fireproofing, asbestos abatement as required (CMU walls and stucco), and cladding around the plaza deck level) to the existing condominium building. - Hillside Estates.
To construct Interior Alterations for the installation of five boilers in the existing Energy Center buildings second floor. "EPCOR District Energy Centre"
To construct a new commercial building (new public washroom). - Beaver Hills House (Michael Phair Park)
To construct exterior alterations (building facade demolition, abatement, framing, building facade installation & canopies to the North and East faces) to the existing Commercial Building. - Rice Howard Place
To construct EXCAVATION AND SHORING ONLY for the below-grade LRT pedway structure (Part A ONLY) along 99st from the existing Churchill station north to the existing tangent pile structure at the north curb line of 103A Avenue. Separate permits are required for future phases.
To change the use of from Office to Assembly (Group D to A2) and construct interior alterations (floors 8, 9, 10 &11) - NorQuest College
To construct an underground pedway SHELL ONLY from Station Lands Parkade to Station Lands property line (for future connection to the City Pedway) - Station Lands South Structure.
To construct Interior Alterations (Air handling unit upgrades only) to an existing building. “TD Tower”
To construct a 4 storey addition to an existing performance theatre building and district energy building (New Music Box Theatre, associated amenities, circulation, and administration. New underground parkade and interior alterations to the existing building) - Francis Winspear Centre for Music.
Interior Alteration - Tenant improvement on the 18th & 19th floors of Stantec Tower. The new office space will include an interconnected staircase between the floors, reception area, meeting rooms, café, trial prep, record and filing rooms, offices, and open workstations.
Interior Alteration - Interior improvements including: flooring, painting, washroom renovations and kitchen space. Lloyd Sadd Office. (Bell Tower 3 storey annex building)
To construct Interior Alterations to two floors of an existing mixed use building. 14th and 15th floor. "22051 Bennett Jones"- Stantec Tower
To construct Interior Alterations in an existing office tower - Tenant fit up for "BMO Edmonton" - 19th floor and partial 20th floor. Not in scope, under separate permit cross over floor was re-established from 19th to the 18th floor. Newly delegated 4, 9, 14, 18, 23 & 25.
TEMPORARY Special event April 18 to June 18/23 (stage, big screen, 3 @ 16'x8' reefers, 2@ 41'6x19'4 bleachers, 3@10'x10' & 5@20'x10' tents and 40 portable washrooms) INSTALLED WITHOUT PERMITS - Playoffs Fan Park.
To do selective demolition and construct Interior Alterations (tenant fit-up for the offices located on 9th, 14th, and 15th floors) and renovation of the base building washrooms; and elevator Lobbies on each floor) in Sun Life Place -- "LEGAL AID ALBERTA"--
To construct exterior and interior alterations. Interior alterations (replacement of major mechanical systems, upgrading electrical service including the main service) and Exterior alterations (adding exterior exit stairs for emergency egress only). (Edmonton Convention Centre)
To construct Interior Alterations to the 6th and 12th floor. "Edmonton - Sterling Place Densification"
To construct Exterior & Interior Alterations. "Centennial Plaza at Stanley Milner Library". Redevelop south plaza, exterior changes to West and East Pavillion (accessory buildings) & removal of existing amphitheater for a new daycare outdoor playspace
To construct addition, exterior and interior alterations to an existing to a Professional, Financial and Office Support Services Use building. "Canadian Western Bank Place"
To construct Interior Alteration P1 thought Level 22 and roof Elevator modernization, door hardware upgrades, selective demolition and re-installation of wall/ceiling finishes for core washroom (no additional fixtures) upgrade. (see notes)
Exterior and interior alterations to a mixed use commercial building. Alterations to existing lobby to create shell tenant space.
To construct SHORING AND EXCAVATION ONLY for future multi use building - The Parks.
To construct an Addition of a Major Impact Utility Service building above covered parking space (includes Stair 13. 1 Cooling Tower, 1 Mua Unit) - EPCOR District Energy Building.
To construct Interior Alteration - TD Wealth (23rd and 24th Floor)
To construct interior alterations (Tenant improvement of existing office spaces on Levels 19, 20 and 24) within a Business And Personal Services portion of building - Commerce Place.
To construct Interior and Exterior Alteration - Scotiabank Tower (Stantec Tower E) - New tenant fit out including interior and exterior work
Boardwalk Building. To construct Interior and Exterior Alterations. Major building upgrades throughout, create corridors and demising walls for new shell tenant spaces, updates inside existing tenant spaces. R&R and upgrades to building systems, stairwell, exits, HVAC, fire alarm, sprinkler, standpipe. Addition of 2 new elevators.
Revillon Building To construct Interior and Exterior Alterations. Major building upgrades throughout, create corridors and demising walls for new shell tenant spaces, updates inside existing tenant spaces. R&R and upgrades to building systems, exits, HVAC, IFS Smoke exhaust, electrical, fire alarm, sprinkler, standpipe. R&R Atrium exterior facade north and south faces.
To construct INTERIOR AND EXTERIOR RENOVATIONS TO HSBC BANK PLACE REJUVENATION to an existing Professional, Financial and Office Support Services / Specialty Food Services / General Retail Stores / Health Services building, constructing perimeter walls only for tenant spaces on main and second floor.
To construct Interior Alterations (full floor architectural, mechanical & electrical improvement) in existing office space. - RGMP (floor 21) @ Manulife Place.
To construct interior alterations within a Business And Personal Services use building, Floors 8, 9 & 10, "Enbridge Place". Tenant improvements, Architectural and demountable partitions, glazing, doors, door hardware, millwork, furniture and interior finishes. Mechanical and electrical upgrades to life safety, lighting, addition of plumbing and HVAC.
To construct interior alterations in existing building (floors 3 to 6 only)- Forestry Building Tranche 2 .
To construct Interior Alterations to an existing commercial building - 103 Street Centre. Tenant Lounge, Entrance Lobby and washrooms on main floor. Fitness Center, Conference Center, Lobby and washrooms on Second floor.
To construct an addition (barrier free accessible washrooms on the main and second floors), and to construct exterior alterations (removing stucco to re-instate the original brick underneath the existing building, new walkways on the north and south side of the building on Site) to an existing Professional, Financial and Office Support Services Use building. (Industrial Health Lab). This scope includes the restoration and rehabilitation of a heritage building and converting it to D occupancy.
To construct an Assembly Use addition to an existing Business & Personal Services Use building and to construct exterior and interior alterations. Facade improvement, Shell only, Tenant fit-up requires separate permit.
To construct interior alterations to an existing office building for North and South Tower of Edmonton Law Courts.
To construct an access/egress and service facility addition for a transit station - Churchill Connector for Valley Line LRT (Phase 1)
To construct interior alterations. Tenant Improvements to second and third storeys of an office building. Third floor office area with life safety items only, ready for future expansion.
To construct exterior alterations and wading pool upgrades - City Hall and Churchill Square.
To construct interior alterations to the 27th & 28th floors of Telus Plaza South.
To construct an accessory building (Bike storage) to an existing Commercial Use building. Not to be used to store flammable liquids or materials. Not to be used for gas powered equipment or tools.
To construct exterior and interior alterations for new mechanical penthouse on an existing office building - Telus Toll Building, phase 3.
To Construct interior alterations (2nd phase for fit-up) to an existing school. Norquest Heritage tower renovation - Main to 8th Floor
To construct a non-combustible storage building, accessory to "The Pint Downtown" restaurant. (Condo Common Area Plan 9020932)
To construct interior alterations to an office building (tenant fit-up/east 2nd floor) CoE public offices - Edmonton Tower.
To construct EXCAVATION & SHORING ONLY for an underground parkade PHASE 2 (ICE District)
To construct an elevated pedway link over 102 Street to connect the Kelly Ramsey Building to the Manulife Building.
To construct an addition to an existing office building and to construct interior and exterior alterations (re-cladding of exterior of building, new entrance canopy and replacement of vestibule, outdoor patio, rooftop screening, hardsurfacing and landscaping modifications and upgrades, installation of complete sprinkler system) - WSP Place.
To construct interior alterations to a tenant space (WSP CANADA). Includes two new barrier-free washrooms on level 12 in tenant space.
To construct interior tenant fit-up: entry/escalator/elevator lobby, second storey and mezzanine, and partial 3rd floor of Arena/Block K compex ("Grand Villa Casino")
To construct a STRUCTURAL FRAME ONLY to grade for a 4-storey underground parkade (part of the ICE district parkade) for a 66-storey multiuse building
To construct a five-storey "BLOCK K" mixed-use commercial building addition (Shell Only) to the Edmonton Arena/indoor Community Rink/pedway (Winter Garden) building
To construct an addition (490.2 square meters of infilling interior open to below spaces and changing the Use to General Retail Stores); exterior alterations (two new mechanical louvres on the second floor); and interior alterations (changing the Use of existing General Retail Stores, Restaurants, Specialty Food Services and Personal Service Shops to Non-accessory Parking with 311 additional vehicular parking stalls of both the west and east sides of the lower concourse level; changing the Use from General Retail Stores, Personal Service Shops, Religious Assembly, Commercial Schools, Professional, Financial and Office Support Services to Specialty Food Services (food court with 503 seats and 1500 square meters of Public Space) on the third floor; changing the Use of a partial General Retail Stores to public washrooms on the second floor; and closure of the existing tunnel under 101 Street for public use) to an existing Commercial Use shopping centre mall. (Edmonton City Centre)
To construct a Public Education Services building "Singhmar Centre for Learning" (North Learning Centre); NorQuest College
RESTRICTED COMMERCIAL BUILDING PERMIT to construct the exterior claddings/closure systems only for a Spectator Sports Establishment (Edmonton Arena) including a Community Rink, pedway (Winter Garden) and K Block casino/office wing.
To construct a multiuse building on an existing underground parkade (retail on main, 30 floors of office) SHELL ONLY, and a pedway connection to the abutting property to the South (Bell Tower) - Edmonton Tower.
To construct a mulit-use building with main floor retail use, 24 floors of office space (on top of an existing underground parkade) and a below grade tunnel connection to Scotia Place - Kelly Ramsey Building.
To construct, excavate and install shoring for future apartment building "Symphony Tower".
To construct a 19 sq m addition (front vestibule), exterior and interior alterations. (Citadel Theatre)
To construct interior alterations to the 13th, 14th, 15th, and 16th floors. (MNP Edmonton -Tenant Improvement to existing floor spaces and additional sprinkler heads on all 4 floors)
To construct an addition and exterior/interior alterations on the eastern podium portion of an existing commercial building. (Standard Life Building)
To construct an addition (Restaurant with 271 seats) to an existing office building. (Joey's Restaurant - Bell Tower)
To construct interior alterations and window replacement to an office building (dismantle existing partitions, ceilings, floorcoverings; limited floor reinforcement; install new base building mechanical and electrical system; restore to SHELL ONLY(no washrooms, no demising walls, no tenant improvements) SHELL ONLY - NO OCCUPANTS - NO STORAGE
To construct an addition to join two existing buildings, to construct interior and exterior alterations (recladding) and to change to use of the buildings (from Group C to D).