7564 Village Centre — projet de développement
Ce projet commercial (plan d'implantation) situé au 7564 Village Centre, dans le quartier Greely (district Ward 20), a fait l'objet de 1 demande devant le processus de demande d'aménagement de la Ville d'Ottawa lors de la séance du 2018-12-12. Statut : à l'étude — dernier statut : Dossier de demande en attente. Type de demande : Site Plan Control.
Historique des demandes (1)
2018-12-12 — Réglementation du plan d'implantation
· Dossier de demande en attente (D07-12-18-0187)
The City of Ottawa has received an application for Site Plan Control Revision application, to construct a 1 storey, 565 square meter commercial building on the south side of the property. The building will have 5 retail units. 46 parking spaces are proposed to be added. The existing 2 storey commercial building on-site is proposed to remain. Site number 1 for the Village Centre project.
Autres projets dans Greely
Plan of Subdivision, Zoning By-law Amendment
This application accompanies the Plan of Subdivision application (deemed complete February 26 2024) for the residential development of seventy one (71) .4 ha lots at Cedar Lake subdivision
The City of Ottawa has received Plan of Subdivision revision application to modify the draft approved subdivision (D07-16-07-0008) at 1934 Stagecoach Road. The changes include removing the park block, increasing the number of lots from 63 to 66 and revising the street layout.
The project consist of the construction of an additional building behind the existing facilities. The proposed building is designed as 1- storey steel structure and has about 326 m2.
A Site Plan Control application to construct a 3 bay service and repair facility, with a mezzanine, with 7 exterior parking spaces.
Official Plan Amendment, Plan of Subdivision
The proposed plan of subdivision comprises phase 2 of a draft approved subdivision (Lakeland Meadows Phase I). Lakeland Meadows Phase I is made up of 34 residential lots averaging 0.3 hectares in lot size, and serviced through private on-site water (well) and wastewater (septic). Phase II differs from Phase I in that the servicing is proposed to be provided through an existing communal water and wastewater system within the adjacent subdivision lands to the immediate south (Shadow Ridge).
Site Plan Control