5254 Bank — projet de développement
Ce projet autre (modification de zonage) situé au 5254 Bank, dans le quartier Greely (district Ward 20), a fait l'objet de 2 demandes devant le processus de demande d'aménagement de la Ville d'Ottawa entre le 2020-06-24 et le 2023-03-17. Statut : à l'étude — dernier statut : Initial Review Comments Sent. Types de demande : Zoning By-law Amendment, Site Plan Control.
Données actualisées le · Les données
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2023-03-17 — Réglementation du plan d'implantation
· Initial Review Comments Sent (D07-12-23-0029)
A Site Plan Control application to construct a 3 bay service and repair facility, with a mezzanine, with 7 exterior parking spaces.
2020-06-24 — Modification au Règlement de zonage
· Règlement de zonage en vigueur (D02-02-20-0049)
Autres projets dans Greely
Plan of Subdivision, Zoning By-law Amendment
Application for a new development for a residential village subdivision including 71 lots.
The City of Ottawa has received Plan of Subdivision revision application to modify the draft approved subdivision (D07-16-07-0008) at 1934 Stagecoach Road. The changes include removing the park block, increasing the number of lots from 63 to 66 and revising the street layout.
The owner is seeking to rezone the property from ME2- Mineral Extraction to RU [193r]- Rural Countryside Zone. The new zone will allow the final portion of the former sand and gravel pit to be repurposed as residential lot. Part of lot 15, concession 4 Geographic township of gloucester
This application accompanies the Plan of Subdivision application (deemed complete February 26 2024) for the residential development of seventy one (71) .4 ha lots at Cedar Lake subdivision
The proposed plan of subdivision comprises phase 2 of a draft approved subdivision (Lakeland Meadows Phase I). Lakeland Meadows Phase I is made up of 34 residential lots averaging 0.3 hectares in lot size, and serviced through private on-site water (well) and wastewater (septic). Phase II differs from Phase I in that the servicing is proposed to be provided through an existing communal water and wastewater system within the adjacent subdivision lands to the immediate south (Shadow Ridge).
Extension of draft approval for Quinn Farm subdivision
Site Plan Control