5254 Bank — development project
This other project (zoning by-law amendment) at 5254 Bank, in the Greely neighbourhood (Ward 20 district), has been the subject of 2 applications before City of Ottawa's development-application process between 2020-06-24 and 2023-03-17. Status: under review — latest status: Initial Review Comments Sent. Application types: Zoning By-law Amendment, Site Plan Control.
Filing history (2)
2023-03-17 — Site Plan Control
· Initial Review Comments Sent (D07-12-23-0029)
A Site Plan Control application to construct a 3 bay service and repair facility, with a mezzanine, with 7 exterior parking spaces.
Other projects in Greely
Plan of Subdivision, Zoning By-law Amendment
This application accompanies the Plan of Subdivision application (deemed complete February 26 2024) for the residential development of seventy one (71) .4 ha lots at Cedar Lake subdivision
The City of Ottawa has received Plan of Subdivision revision application to modify the draft approved subdivision (D07-16-07-0008) at 1934 Stagecoach Road. The changes include removing the park block, increasing the number of lots from 63 to 66 and revising the street layout.
The project consist of the construction of an additional building behind the existing facilities. The proposed building is designed as 1- storey steel structure and has about 326 m2.
Official Plan Amendment, Plan of Subdivision
The proposed plan of subdivision comprises phase 2 of a draft approved subdivision (Lakeland Meadows Phase I). Lakeland Meadows Phase I is made up of 34 residential lots averaging 0.3 hectares in lot size, and serviced through private on-site water (well) and wastewater (septic). Phase II differs from Phase I in that the servicing is proposed to be provided through an existing communal water and wastewater system within the adjacent subdivision lands to the immediate south (Shadow Ridge).
Site Plan Control
The City of Ottawa has received a Site Plan Control application to remove the existing car wash and construct a new 1263.2 square metre building that will four warehouse spaces and four accessory office spaces.