New construction & development in Summerside, Edmonton
15
projects tracked
72
proposed units
15
advancing
2026-06-24
latest activity
As of 2026-06-24, 15 development projects have been reviewed by City of Edmonton's building-permit process in the Summerside area, totalling 72 proposed housing units. The largest is a 64-unit residential project at 4207 Savaryn Drive SW. 14 are new builds, and 15 are currently advancing. Use types: 2 residential, 10 commercial, 1 institutional.
Recent activity
To construct a Residential Use building in the form of a 8 Dwelling Row House with unenclosed front porches.
To construct an addition (4 CSA A277 MODUS modular classrooms) to an existing elementary school building. "Father Michael Mireau"
To construct a Rapid Drive Through Vehicle Service building (car wash) --"Circle K Car Wash #2657 Ellerslie"--
To construct an apartment building (Building 1 of "The Village at Summerside", total of 56 dwellings), with an underground parkade that is shared with two other apartment buildings.
To construct an addition to an industrial building ("Konto/Sofaland"; Phase 2 of 2).
Projects (15)
To construct an apartment building (Building 1 of "The Village at Summerside", total of 56 dwellings), with an underground parkade that is shared with two other apartment buildings.
To construct a Residential Use building in the form of a 8 Dwelling Row House with unenclosed front porches.
To construct an addition (4 CSA A277 MODUS modular classrooms) to an existing elementary school building. "Father Michael Mireau"
To construct a Rapid Drive Through Vehicle Service building (car wash) --"Circle K Car Wash #2657 Ellerslie"--
To construct an addition to an industrial building ("Konto/Sofaland"; Phase 2 of 2).
To construct a Convenience Retail Store building. (PETRO-CANADA)
To change the Use to a Health Services Use and to construct interior alterations to an existing mixed use building for Optimum Wellness Clinic
To construct a office building (Kimberly Homes Offices w/ 4 Leasable Bays. - 4 Demising Walls, 8 RTU's, 5 WC in Kimberly Homes Suite)
To construct a two-Storey Professional, Financial and Office Support Service building.
To construct a General Industrial building and tenant fit up of two commercial retail / warehouse spaces (one shell only commercial space) Demising walls included and RTU for finished spaces only.
To construct a carwash building with an accessory Personal Services Shop (with one Pet-Wash Bay).
To construct an Office Bays 1-2 & 11 (1320.24 m2)/Industrial (1070.24 m2) building "Savaryn Business Centre" Phase 2. (3 partitions, 14RTU, 6 Washroom)
To construct a 3-storey office building with modular solid wood floor system - Vercon Rentals Ltd.
To construct an Office building (Shell building only, 1 RTU, 1 heating appliance in the main floor mechanical room, no washrooms, no demising walls, second and third floor have public corridors between the exit stairwells).
To construct a 2 storey office building "Building 1". 4 New RTU's and 4 other RTU;s on drawings for the future, 45 min fire separation demising wall, 45min floor separtaion, 8 washrooms roughed-in