New construction & development in Gorman, Edmonton
13
projects tracked
24
proposed units
13
advancing
2026-04-10
latest activity
As of 2026-04-10, 13 development projects have been reviewed by City of Edmonton's building-permit process in the Gorman area, totalling 24 proposed housing units. The largest is a 12-unit residential project at 1, 2127 154 Avenue NW. 13 are new builds, and 13 are currently advancing. Use types: 2 residential, 9 commercial.
Recent activity
To construct a new commercial building for retail shops and a Child Care Service. "Active Start Daycare" --Manning Town Centre Building #B1 --Separate Fit Ups (For Bay 1-5) Require Separate Permits
To construct a Residential Use building in the form of a Multi-unit Housing with attached Garages. Total of 12 Dwellings (Bldg #3)
To construct a 12 dwelling stacked row house building with front attached garages.
To construct a new 1 storey Outdoor Mausoleum building. "Evergreen Memorial"
To construct a new single storey multiple tenant (8 CRU's) commercial retail building (SHELL ONLY with three 1hr FRR demising walls) and 10 RTUs. -- Building #2 (Gorman Commercial Development)-- NOTE: Separate Permits required for CRU tenant fit-ups, future demising walls, and gas bar canopy.
Projects (13)
To construct a Residential Use building in the form of a Multi-unit Housing with attached Garages. Total of 12 Dwellings (Bldg #3)
To construct a 12 dwelling stacked row house building with front attached garages.
To construct a new commercial building for retail shops and a Child Care Service. "Active Start Daycare" --Manning Town Centre Building #B1 --Separate Fit Ups (For Bay 1-5) Require Separate Permits
To construct a new 1 storey Outdoor Mausoleum building. "Evergreen Memorial"
To construct a new single storey multiple tenant (8 CRU's) commercial retail building (SHELL ONLY with three 1hr FRR demising walls) and 10 RTUs. -- Building #2 (Gorman Commercial Development)-- NOTE: Separate Permits required for CRU tenant fit-ups, future demising walls, and gas bar canopy.
To construct a new 7-ELEVEN Gas Bar canopy.
To construct a two-storey multi-use commercial building SHELL ONLY (with only 1 hr FSR on the main floor at gridline#1-E and GL-1G and 12 RTUs), including FUTURE Health Service and General Retail Stores on the main floor, and FUTURE Child Care Services (100) on the 2nd floor --"Building #1- Gorman Commercial Development"
To construct a new single storey single tenant "shell ONLY" commercial building (includes 3 RTU's) Manning Building L3 CRU Tenant fit-up NOT included and requires separate permits. No demising walls included.
To construct a 1 storey SHELL General Retail Stores and Restaurant (Tim Hortons) with a Drive-in Food Services Use building ("Building M1", 7 RTUs, 2 hr demising wall along grid line 3,5,6,7 only).
To construct an Addition to a General Retail commercial building. Shell only, 3 RTU's, 1 hour demising wall on grid line 22.
To construct an industrial building. (Manning Recycling Depot)
To construct a General Retail Stores Use building with Accessory Automotive and Equipment Repair Shops and outdoor garden centre (Canadian Tire - Manning Town Centre)
To construct a SHELL ONLY Office & Personal Service / Restaurant Building ("I2" Manning Town Centre - Restaurant (I2A), Bank (I2B).(Demising wall, 0 Washrooms, 4 RTU's)