As of 2026-04-16, 16 development projects have been reviewed by City of Edmonton's building-permit process in the Eastgate Business Park area. 13 are new builds, and 16 are currently advancing. Use types: 4 commercial.
Recent activity
To construct a new Commercial building (convenience retail store with specialty food services) - Shell 101 ave. NW
To construct a new 2 storey 1,774 ft2 (164 m2) commercial building (F2 occupancy) as an accessory building to the main building on-site. - The Villa 2
To construct a new General Industrial building (18.29m x 48.77m assembly building)
To complete a partial demolition (existing foundation to remain) of an existing utility building and re-construct new Commercial building (utility pumping station). --Epcor (PW141)--
To construct a new Commercial building 32'x50' permanent steel frame/shell structure for unheated cold storage industrial materials only. "Strathcona Refinery Storage Shed"
Projects (16)
To construct a new Commercial building (convenience retail store with specialty food services) - Shell 101 ave. NW
To construct a new 2 storey 1,774 ft2 (164 m2) commercial building (F2 occupancy) as an accessory building to the main building on-site. - The Villa 2
To construct a new General Industrial building (18.29m x 48.77m assembly building)
To complete a partial demolition (existing foundation to remain) of an existing utility building and re-construct new Commercial building (utility pumping station). --Epcor (PW141)--
To construct a new Commercial building 32'x50' permanent steel frame/shell structure for unheated cold storage industrial materials only. "Strathcona Refinery Storage Shed"
To construct a new Industrial Use Building (10 CRU bays) pre-engineered frame with 4HR firewall at Gridline 6, 2HR demising walls Gridlines 7,8,9. No RTUs. Separate permit required for tenant improvements. "BUILDING 'B'"
To construct a new General Industrial Use pre-engineered building, Shell only, no demising walls, no washrooms, no RTUs. Separate permit required for tenant improvement, "BUILDING C".
To construct an industrial building, SHELL ONLY (pre-eng metal building w/ demising walls at Gridline 4 & 5 of 2HR. No washrooms, no RTUs) Separate permit required for tenant fit-ups, "BUILDING A".
To change the use from multi tenant F2/D building to a single tenant A2 Assembly building. Addition (Foyer Expansion), Exterior Alterations (new windows, and doors), Interior Alterations (complete renovations throughout)
To construct a 2nd-floor addition (mezzanine), and interior alterations to a General Industrial Use building (IPEX).
To construct interior alterations within a Business And Personal Services use building (modernization work) - Edmonton Catholic School District Building. Multiple floor interior renovations throughout all the "Blocks" - 1 Hour demising wall separating new meeting/conference room and corridor from office portion of building
To Construct a Quonset Building and a Bridge Crane.
To construct an Accessory Building (Bike shelter) to an existing Commercial Building
To construct a General Industrial Use Building (waste water treatment building - DAAM Galvanizing).
To construct a General Industrial Use building (Substation B, C, H Project/Building 106-Replacement)
To construct an Accessory Building for a General Industrial Use site.