New construction & development in Dominion Industrial, Edmonton
9
projects tracked
9
advancing
2024-07-24
latest activity
As of 2024-07-24, 9 development projects have been reviewed by City of Edmonton's building-permit process in the Dominion Industrial area. 2 are new builds, and 9 are currently advancing. Use types: 1 commercial.
Recent activity
To construct a new 40'x140' open storage (Lean-To with a roof and one side wall) addition to an existing commercial building. - Pacific West Systems Supply Ltd
To construct an addition (952 sqft Cold Storage Addition) to a General Industrial Use building (WESCOR SALES LTD - WESCOR FOOD EQUIPMENT).
To construct a General Contractor/warehouse Service building. "SVM New Warehouse" 2 - 2 Hr demising walls and 1 - 1 Hr demising wall
To construct an Addition to an Existing Building - Canada Post Vestibule
CLU - To construct exterior alterations (front addition and RTU's) and to construct interior alterations (partition walls) to an existing commercial building - Russell Hendrix Restaurant Equipment and Supplies
Projects (9)
To construct a new 40'x140' open storage (Lean-To with a roof and one side wall) addition to an existing commercial building. - Pacific West Systems Supply Ltd
To construct an addition (952 sqft Cold Storage Addition) to a General Industrial Use building (WESCOR SALES LTD - WESCOR FOOD EQUIPMENT).
To construct a General Contractor/warehouse Service building. "SVM New Warehouse" 2 - 2 Hr demising walls and 1 - 1 Hr demising wall
To construct an Addition to an Existing Building - Canada Post Vestibule
CLU - To construct exterior alterations (front addition and RTU's) and to construct interior alterations (partition walls) to an existing commercial building - Russell Hendrix Restaurant Equipment and Supplies
To construct an addition (622.3 sqm) to an existing General Industrial building ("I Mark Architectural Metals").
To construct interior and exterior alterations (two new elevators with rooftop housing, new interior finishes, removal/addition of partition walls, and new windows on east and south exterior walls of second floor) to the "Alberta Government Learning Resource Centre" building.
To construct a General Industrial Use building and fit up offices in the front of combined units 1 and 2. (2 RTU's over units 1 and 2 and 2 RTU curbs for future RTU's over units 3 and 4. 1 demising wall with a 1 hour fire separation between units 2 and 3.)
To change the use from General Contractor Services to General Industrial and to construct an addition and interior alterations (new offices in existing building and manufacturing/workshop addition (267.56m2)).