Ce projet autre (démolition) situé au 72 Templeton, dans le quartier Sandy Hill (district Ward 12), a fait l'objet de 1 demande devant le processus de demande d'aménagement de la Ville d'Ottawa lors de la séance du 2011-11-30. Statut : à l'étude — dernier statut : Dossier de demande en attente. Type de demande : Demolition Control.

Historique des demandes (1)

2011-11-30 — Réglementation des démolitions · Dossier de demande en attente (D07-05-11-0006)
Description of Site and Surroundings: The property is located within the block containing the University's Sports Complex. The surrounding land uses to the west, north and south are primarily part of the University of Ottawa campus and to the east is primarily low-rise residential land uses. Purpose of Demolition Control Proposal: To demolish the existing single detached building.

Autres projets dans Sandy Hill

Two 28-storey high-rise apartments connected by an 8-storey podium, that will include ground floor commercial space and 14 visitor parking spaces in an underground garage. 579 Dwelling Units. Reduced Amenity Space requirement requested to accomodate 5 additional units
579 logements28 étagesrésidentielà l'étude
Zoning By-law Amendmentdernière activité 2024-07-241 demande(s) fiche du projet dossier D02-02-24-0031
Ontario Heritage Act, Site Plan Control
121 logements9 étagesrésidentielà l'étude
Ontario Heritage Act, Site Plan Controldernière activité 2026-03-043 demande(s) fiche du projet dossier D09-04-26-0009
A Site Plan application to permit the development of a 7-storey mixed-use condominium building with 68 units and retail space at grade.
68 logements7 étagesmixteà l'étude
Site Plan Controldernière activité 2016-04-251 demande(s) fiche du projet dossier D07-12-16-0052
The proposed development is to demolish the existing 1-storey dwelling along with the existing 2 accessory structures in the rear and construct a 4-storey, 28-unit low-rise apartment dwelling. The proposed development proposes 28 bicycle parking spaces, zero vehicular parking spaces, a 1.8 m walkway from the sidewalk directly to the front door.
28 logements4 étagesrésidentielà l'étude
Zoning By-law Amendment, Site Plan Controldernière activité 2026-02-112 demande(s) fiche du projet dossier D02-02-26-0012
A Site Plan Control application has been received to construct a four-storey low-rise apartment building with two basement levels for 23 supportive housing units, a storage area for bicycle parking in the rear yard, and no on-site vehicular parking.
23 logements4 étagesrésidentielen progression
Zoning By-law Amendment, Site Plan Controldernière activité 2025-01-132 demande(s) fiche du projet dossier D07-12-25-0002
The proposed development, which will have the address of 282 Laurier Avenue East, contemplates a four-storey addition along the east face of the existing six-storey, residential building located on the subject property. A total of 18 dwelling units are proposed with a separate main entrance along the north face accessed from Laurier Avenue.
18 logements4 étagesrésidentielen progression
Zoning By-law Amendment, Site Plan Controldernière activité 2024-06-173 demande(s) fiche du projet dossier D07-12-24-0042
Application for alteration at 29 Russell Avenue (23 Russell Avenue), a property located in the Russell-Range Heritage Conservation District
7 logements3 étagesrésidentielà l'étude
Zoning By-law Amendment, Site Plan Control, Ontario Heritage Actdernière activité 2023-01-173 demande(s) fiche du projet dossier D09-04-23-0004
Zoning By-law Amendment, Site Plan Control
21 étagesautreen progression
Zoning By-law Amendment, Site Plan Controldernière activité 2021-11-162 demande(s) fiche du projet dossier D02-02-21-0141