NearbyBuildsOttawa

72 Templeton — development project

otherunder review

This other project (demolition) at 72 Templeton, in the Sandy Hill neighbourhood (Ward 12 district), has been the subject of 1 application before City of Ottawa's development-application process at its 2011-11-30 meeting. Status: under review — latest status: Application File Pending. Application type: Demolition Control.

Filing history (1)

2011-11-30 — Demolition Control · Application File Pending (D07-05-11-0006)
Description of Site and Surroundings: The property is located within the block containing the University's Sports Complex. The surrounding land uses to the west, north and south are primarily part of the University of Ottawa campus and to the east is primarily low-rise residential land uses. Purpose of Demolition Control Proposal: To demolish the existing single detached building.

Other projects in Sandy Hill

Two 28-storey high-rise apartments connected by an 8-storey podium, that will include ground floor commercial space and 14 visitor parking spaces in an underground garage. 579 Dwelling Units. Reduced Amenity Space requirement requested to accomodate 5 additional units
579 units28 storeysresidentialunder review
Zoning By-law Amendmentlatest activity 2024-07-241 filing(s) project page file D02-02-24-0031
Ontario Heritage Act, Site Plan Control
121 units9 storeysresidentialunder review
Ontario Heritage Act, Site Plan Controllatest activity 2026-03-043 filing(s) project page file D09-04-26-0009
A Site Plan application to permit the development of a 7-storey mixed-use condominium building with 68 units and retail space at grade.
68 units7 storeysmixed-useunder review
Site Plan Controllatest activity 2016-04-251 filing(s) project page file D07-12-16-0052
The proposed development is to demolish the existing 1-storey dwelling along with the existing 2 accessory structures in the rear and construct a 4-storey, 28-unit low-rise apartment dwelling. The proposed development proposes 28 bicycle parking spaces, zero vehicular parking spaces, a 1.8 m walkway from the sidewalk directly to the front door.
28 units4 storeysresidentialunder review
Zoning By-law Amendment, Site Plan Controllatest activity 2026-02-112 filing(s) project page file D02-02-26-0012
A Site Plan Control application has been received to construct a four-storey low-rise apartment building with two basement levels for 23 supportive housing units, a storage area for bicycle parking in the rear yard, and no on-site vehicular parking.
23 units4 storeysresidentialadvancing
Zoning By-law Amendment, Site Plan Controllatest activity 2025-01-132 filing(s) project page file D07-12-25-0002
The proposed development, which will have the address of 282 Laurier Avenue East, contemplates a four-storey addition along the east face of the existing six-storey, residential building located on the subject property. A total of 18 dwelling units are proposed with a separate main entrance along the north face accessed from Laurier Avenue.
18 units4 storeysresidentialadvancing
Zoning By-law Amendment, Site Plan Controllatest activity 2024-06-173 filing(s) project page file D07-12-24-0042
Application for alteration at 29 Russell Avenue (23 Russell Avenue), a property located in the Russell-Range Heritage Conservation District
7 units3 storeysresidentialunder review
Zoning By-law Amendment, Site Plan Control, Ontario Heritage Actlatest activity 2023-01-173 filing(s) project page file D09-04-23-0004
Zoning By-law Amendment, Site Plan Control
21 storeysotheradvancing
Zoning By-law Amendment, Site Plan Controllatest activity 2021-11-162 filing(s) project page file D02-02-21-0141