700, 5555 Calgary Trail NW — projet de développement
Ce projet commercial (rénovation) situé au 700, 5555 Calgary Trail NW, dans le quartier Calgary Trail North, a fait l'objet de 2 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2019-07-02 et le 2020-01-27. Valeur estimée des travaux : $5.0M. Statut : en progression — dernier statut : Issued. Types de demande : Interior Alterations — Commercial Final, Exterior Alterations — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2020-01-27 — Exterior Alterations — Commercial Final
· Issued (1-327067259)
To construct Exterior Alterations to a commercial building with Non-conforming Uses including Professional, Financial and Office Support Services, Convenience Retail Store and Health Service (facade improvement - new exterior cladding and parkade railing)
2019-07-02 — Interior Alterations — Commercial Final
· Issued (0-312598320)
To construct interior alterations to an existing building. Renovate floors 7,8, and 9. To provide offices for Clark Builders with an opening into the concrete slab to allow for a stair opening between floors 7-8 and 8-9, (Weber Building: Suites# 700,800,900). Only one tenant.
Autres projets dans Calgary Trail North
To construct a new commercial building (shell ONLY). (2 RTU's, 0 demising walls) --"Ever Square - Building A2"-- NOTE: Tenant fit-up requires separate permit
To construct a Restaurant with Drive-in Food Services (Krispy Kreme Doughnuts), 2 RTUs and 1 MUA
To construct a new 1 storey, 931 m2 , A2 occupancy, commercial building (shell ONLY - demising walls NOT included).- Ever Square - Building B NOTE: Tenant fit-up requires separate permit
To construct an Addition, Interior and Exterior alterations to an existing retail building - New 2 Storey subsidiary building separated by a 4Hr firewall - "SUNDANCE SKI SHOP" - demolish a portion of existing building, Solar panel installation on roof. Revised for 4Hr New Firewall Extension (Cap)
To construct a two-storey (main floor future Retail occupancy and second floor future daycare & office occupancy) commercial building. (SHELL only, Sprinklered, 32 RTU's, 0 washrooms, main floor lobby partition walls, 3 - 1HR demising wall main floor, 2- 2HR demising walls second floor, second floor public corridor, future daycare 2HR demising wall & stairwell walls) --Alliance Centre Gateway-- NOTE: CRU Tenant fit-up and tenant demising walls NOT included and requires separate permits
To construct a General Retail Store building ( Shell Only) and to revise and re-configure a portion of the existing vehicular parking layout. With 7 RTU and one roof top refrigeration unit. No demising walls with one sprinkler room and one electrical room one receiving area.
To construct an Assembly use building, ''Building 2''. Shell only, one demising wall on grid line 4 rated 1 hour, 5 RTU's.
To construct an Assembly Restaurant use building with outdoor patio and a dual-lane drive-through, building 1, ''PETER'S DRIVE-IN''.