NearbyBuildsEdmonton

Nouvelles constructions et développements à Calgary Trail North, Edmonton

14
projets suivis
14
en progression
2024-04-24
dernière activité

En date du 2024-04-24, 14 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Calgary Trail North. 9 sont des constructions neuves et 14 sont en progression. Usages : 12 commercial.

Activité récente

To construct a Restaurant with Drive-in Food Services (Krispy Kreme Doughnuts), 2 RTUs and 1 MUA
$24.5Mcommercialen progression
New — Commercial Finaldernière activité 2024-04-243 demande(s) fiche du projet permis 7-475521617
To construct a two-storey (main floor future Retail occupancy and second floor future daycare & office occupancy) commercial building. (SHELL only, Sprinklered, 32 RTU's, 0 washrooms, main floor lobby partition walls, 3 - 1HR demising wall main floor, 2- 2HR demising walls second floor, second floor public corridor, future daycare 2HR demising wall & stairwell walls) --Alliance Centre Gateway-- NOTE: CRU Tenant fit-up and tenant demising walls NOT included and requires separate permits
$5.2Mcommercialen progression
New — Commercial Finaldernière activité 2024-02-051 demande(s) fiche du projet permis 4-471250904
To construct a new commercial building (shell ONLY). (2 RTU's, 0 demising walls) --"Ever Square - Building A2"-- NOTE: Tenant fit-up requires separate permit
$1.8Mcommercialen progression
New — Commercial Finaldernière activité 2024-01-223 demande(s) fiche du projet permis 22-432513535
To construct a new 1 storey, 931 m2 , A2 occupancy, commercial building (shell ONLY - demising walls NOT included).- Ever Square - Building B NOTE: Tenant fit-up requires separate permit
$2.6Mcommercialen progression
New — Commercial Finaldernière activité 2023-06-211 demande(s) fiche du projet permis 30-432513535
To construct an Addition, Interior and Exterior alterations to an existing retail building - New 2 Storey subsidiary building separated by a 4Hr firewall - "SUNDANCE SKI SHOP" - demolish a portion of existing building, Solar panel installation on roof. Revised for 4Hr New Firewall Extension (Cap)
$1.0Mcommercialen progression
Addition — Commercial Finaldernière activité 2023-02-061 demande(s) fiche du projet permis 14-392770219

Projets (14)

To construct a Restaurant with Drive-in Food Services (Krispy Kreme Doughnuts), 2 RTUs and 1 MUA
$24.5Mcommercialen progression
New — Commercial Finaldernière activité 2024-04-243 demande(s) fiche du projet permis 7-475521617
To construct a two-storey (main floor future Retail occupancy and second floor future daycare & office occupancy) commercial building. (SHELL only, Sprinklered, 32 RTU's, 0 washrooms, main floor lobby partition walls, 3 - 1HR demising wall main floor, 2- 2HR demising walls second floor, second floor public corridor, future daycare 2HR demising wall & stairwell walls) --Alliance Centre Gateway-- NOTE: CRU Tenant fit-up and tenant demising walls NOT included and requires separate permits
$5.2Mcommercialen progression
New — Commercial Finaldernière activité 2024-02-051 demande(s) fiche du projet permis 4-471250904
To construct a new commercial building (shell ONLY). (2 RTU's, 0 demising walls) --"Ever Square - Building A2"-- NOTE: Tenant fit-up requires separate permit
$1.8Mcommercialen progression
New — Commercial Finaldernière activité 2024-01-223 demande(s) fiche du projet permis 22-432513535
To construct a new 1 storey, 931 m2 , A2 occupancy, commercial building (shell ONLY - demising walls NOT included).- Ever Square - Building B NOTE: Tenant fit-up requires separate permit
$2.6Mcommercialen progression
New — Commercial Finaldernière activité 2023-06-211 demande(s) fiche du projet permis 30-432513535
To construct an Addition, Interior and Exterior alterations to an existing retail building - New 2 Storey subsidiary building separated by a 4Hr firewall - "SUNDANCE SKI SHOP" - demolish a portion of existing building, Solar panel installation on roof. Revised for 4Hr New Firewall Extension (Cap)
$1.0Mcommercialen progression
Addition — Commercial Finaldernière activité 2023-02-061 demande(s) fiche du projet permis 14-392770219
To construct a General Retail Store building ( Shell Only) and to revise and re-configure a portion of the existing vehicular parking layout. With 7 RTU and one roof top refrigeration unit. No demising walls with one sprinkler room and one electrical room one receiving area.
$2.0Mcommercialen progression
New — Commercial Finaldernière activité 2023-01-091 demande(s) fiche du projet permis 8-413551353
To construct an addition, interior and exterior alterations to a General Industrial use building. (alter and reconstruct portions of existing roof, construct new mezzanine and new second floor) (unheated garage addition).
$721Kindustrielen progression
Addition — Commercial Finaldernière activité 2022-09-231 demande(s) fiche du projet permis 2-415323281
To construct an Addition to Existing Building, Exterior Alteration to an Existing Building; (Adding 3 rooftop and Antenna structure enclosed behind a Shroud on top of the Penthouse Roof level 3) --W6078 Weber Center Relocate--
$20Kcommercialen progression
Addition — Commercial Finaldernière activité 2022-05-241 demande(s) fiche du projet permis 4-387894921
To construct an accessory Night Club/Bar and Neighbourhood Pub building (16'x 40' seacans/ CSA-A277 Factory Built) to be used as a change room for performers. "Midway Music- Green Room Expansion"
$100Kcommercialen progression
New — Commercial Finaldernière activité 2022-01-121 demande(s) fiche du projet permis 3-407668938
To construct Exterior Alterations to a commercial building with Non-conforming Uses including Professional, Financial and Office Support Services, Convenience Retail Store and Health Service (facade improvement - new exterior cladding and parkade railing)
$5.0Mcommercialen progression
Interior Alterations — Commercial Final, Exterior Alterations — Commercial Finaldernière activité 2020-01-272 demande(s) fiche du projet permis 1-327067259
To construct a new commercial building shell with General Retail Stores on the main floor (6 potential CRUs - no demising walls between the retail spaces, mix of RTUs and in-suite mechanical) and a Child Care Service (88 Children) on the second floor - Pagaro South
$6.0Mcommercialen progression
New — Commercial Finaldernière activité 2019-11-272 demande(s) fiche du projet permis 5-323156802
To construct interior and exterior alterations to an existing building - (Dept. 9 Studios). (change the Use from General Industrial to Media Studio)
$3.0Mindustrielen progression
Interior Alterations — Commercial Finaldernière activité 2019-09-131 demande(s) fiche du projet permis 3-303082293
To construct an Assembly use building, ''Building 2''. Shell only, one demising wall on grid line 4 rated 1 hour, 5 RTU's.
$830Kcommercialen progression
New — Commercial Finaldernière activité 2019-07-112 demande(s) fiche du projet permis 11-293457112
To construct an Assembly Restaurant use building with outdoor patio and a dual-lane drive-through, building 1, ''PETER'S DRIVE-IN''.
$1.8Mcommercialen progression
New — Commercial Finaldernière activité 2019-07-091 demande(s) fiche du projet permis 7-293457112

Autres quartiers de Edmonton

DowntownChappelle AreaInglewoodGlenwoodMistatim IndustrialClover Bar AreaPrince CharlesWestmountSecordGarneauKeswickSpruce Avenue