2616 91 Street NW — projet de développement
Ce projet commercial (construction neuve) situé au 2616 91 Street NW, dans le quartier Parsons Industrial, a fait l'objet de 3 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2015-08-24 et le 2019-11-19. Valeur estimée des travaux : $1.8M. Statut : en progression — dernier statut : Issued. Types de demande : Addition — Commercial Final, New — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (3)
2019-11-19 — New — Commercial Final
· Issued (4-311107275)
To construct a Liquor Store building, accessory to an existing Warehouse Sales building and to construct exterior alterations (reconfigure parking lot)
2015-09-22 — Addition — Commercial Final
· Issued (8-170222459)
To replace, relocate, and upgrade an existing propane facility (Costco)
2015-08-24 — Addition — Commercial Final
· Issued (6-170222459)
To construct an addition to an existing Warehouse Sales Use building (Costco)
Autres projets dans Parsons Industrial
To construct a single storey 5 CRU commercial building (base building includes 4 - 2 HR demising walls, 6 RTU's) - District 23 (Bldg 4) CRU Tenant fit-up's requires separate permits
To construct a religious assembly building WORK STARTED WITHOUT PERMITS - Masjid Al-Fatima.
To construct an addition to a general industrial building ("Andarr Electrical"; addition is warehouse and SHELL office area. Interior of office requires separate permit).
To construct an addition (1557sq.m.) to a General Industrial building - Noodle Factory - production area.
To construct a new 2 storey commercial building for an 13 bay automotive repair shop, with offices located on the main & 2nd floor. (Parsons Plaza)
To construct an accessory industrial building (storage facility) - Coca-Cola.
To construct a minor impact utility structure at AltasGas Edmonton Ethane Plant (size 3.3m x 4 m; built to accommodate electrical PLC, MCC and recifine panel).
To construct an Addition (selective demolition, piling installation, excavation with duct bank support, and concrete works. Then, masonry, steel framing, roofing, and interior tie-ins will follow.) to an existing building; “Epcor”