En date du 2026-05-01, 18 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Parsons Industrial. 8 sont des constructions neuves et 18 sont en progression. Usages : 9 commercial, 1 institutionnel.
Activité récente
To construct a Quonset tent structure 15.25m x 18.28m at 0m from an existing Industrial building per 3.1.18.3.(3)(b)
To construct an Addition (selective demolition, piling installation, excavation with duct bank support, and concrete works. Then, masonry, steel framing, roofing, and interior tie-ins will follow.) to an existing building; “Epcor”
To construct a new 2 storey commercial building for an 13 bay automotive repair shop, with offices located on the main & 2nd floor. (Parsons Plaza)
To construct a 2 storeys medium-hazard industrial building (car dealership). --Lakewood Chevrolet-- (NOTE: separate permit required for spray booth)
To construct a single storey 5 CRU commercial building (base building includes 4 - 2 HR demising walls, 6 RTU's) - District 23 (Bldg 4) CRU Tenant fit-up's requires separate permits
Projets (18)
To construct a Quonset tent structure 15.25m x 18.28m at 0m from an existing Industrial building per 3.1.18.3.(3)(b)
To construct an Addition (selective demolition, piling installation, excavation with duct bank support, and concrete works. Then, masonry, steel framing, roofing, and interior tie-ins will follow.) to an existing building; “Epcor”
To construct a new 2 storey commercial building for an 13 bay automotive repair shop, with offices located on the main & 2nd floor. (Parsons Plaza)
To construct a 2 storeys medium-hazard industrial building (car dealership). --Lakewood Chevrolet-- (NOTE: separate permit required for spray booth)
To construct a single storey 5 CRU commercial building (base building includes 4 - 2 HR demising walls, 6 RTU's) - District 23 (Bldg 4) CRU Tenant fit-up's requires separate permits
To change the use from Medium (F2) to Low Hazard (F3) industrial building and construct a 696.77 sq.m Addition- "City Spring". MAX 10 PERSONS.
To construct an Addition to a General Industrial use building. 302m2 addition with mezzanine.
Construction two additions to an existing office/warehouse building - AR Thompson.(Partial sprinkler system, Office, warehouse has standpipe)
To construct a Liquor Store building, accessory to an existing Warehouse Sales building and to construct exterior alterations (reconfigure parking lot)
To construct a 470 m2 addition to an industrial building - Westpower Equipment Ltd.
To construct a minor impact utility structure at AltasGas Edmonton Ethane Plant (size 3.3m x 4 m; built to accommodate electrical PLC, MCC and recifine panel).
To construct an accessory industrial building (storage facility) - Coca-Cola.
To construct an addition to a general industrial building ("Andarr Electrical"; addition is warehouse and SHELL office area. Interior of office requires separate permit).
To construct an industrial building with mezzanine (autobody shop) - A&V Collision.
To construct an addition to an existing General Industrial Use building (workshop - existing without permits - HERBERS AUTOBODY)
To construct an addition (1557sq.m.) to a General Industrial building - Noodle Factory - production area.
To construct an addition to an existing Automotive and Equipment Repair Shops Use and General Industrial Use building (addition to Deol Auto Services Ltd)
To construct a religious assembly building WORK STARTED WITHOUT PERMITS - Masjid Al-Fatima.