11917 40 Street NW — projet de développement
Ce projet institutionnel (agrandissement) situé au 11917 40 Street NW, dans le quartier Beacon Heights, a fait l'objet de 3 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2015-07-27 et le 2025-11-17. Valeur estimée des travaux : $400K. Statut : en progression — dernier statut : Issued. Types de demande : Addition — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (3)
2025-11-17 — Addition — Commercial Final
· Issued (5-615713061)
To move on Two(2) modular classrooms to a Public Education Services Building. Includes creating a link to the main school. - "St. Bernadette School". Separate permit required for the removal of modulars from Bishop Savaryn School.
2019-01-14 — Addition — Commercial Final
· Issued (1-251471370)
To construct an addition (1 portable classroom) to an existing School - St. Bernadette.
2015-07-27 — Addition — Commercial Final
· Issued (1-172685833)
To construct and move on 1 self built portable classroom as an addition to 2 existing portables to an existing Public Education Service building - St. Bernadette
Autres projets dans Beacon Heights
To construct a 21 unit Stacked Row House building. ****Variance required for non-masonry firewall ****
To construct a Residential Use building in the form of a 4 Dwellings Row House with unenclosed front porches, front and rear uncovered deck (Units A & D), side uncovered deck (Units B & C) and to develop 3 Secondary Suites in the Basements (Units A, B & D), and Basements Development (Unit C) (NOT to be used as an additional Dwelling).
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porch(s) and to develop 4 Secondary Suites in the Basement(s).
To construct a SHELL ONLY retail building (3 CRU's, 1 one hour demising walls, 3 RTU's, 3 GM's. [Washrooms and one 1 hour demising wall removed from scope Jan.23/2023] Fire alarm removed March 18/2024]
To construct a new bakery building (lots 4,5), and construct exterior alterations to an existing retail building (lots 1,2) for Italian Bakery. Scope of work includes one 4hr firewall, 1 rooftop unit, and 1 BF washroom. Maximum occupant load 10 people.
To Construct a new commercial building for child care services.
To Construct a New Gas Bar Canopy.