Nouvelles constructions et développements à Beacon Heights, Edmonton
8
projets suivis
37
logements proposés
8
en progression
2026-03-12
dernière activité
En date du 2026-03-12, 8 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Beacon Heights, totalisant 37 logements proposés. Le plus important : un projet résidentiel de 21 logements au 11834 35 Street NW. 7 sont des constructions neuves et 8 sont en progression. Usages : 3 résidentiel, 2 commercial, 2 institutionnel.
Activité récente
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porch(s) and to develop 4 Secondary Suites in the Basement(s).
To move on Two(2) modular classrooms to a Public Education Services Building. Includes creating a link to the main school. - "St. Bernadette School". Separate permit required for the removal of modulars from Bishop Savaryn School.
To Construct a new commercial building for child care services.
To construct a Residential Use building in the form of a 4 Dwellings Row House with unenclosed front porches, front and rear uncovered deck (Units A & D), side uncovered deck (Units B & C) and to develop 3 Secondary Suites in the Basements (Units A, B & D), and Basements Development (Unit C) (NOT to be used as an additional Dwelling).
To Construct a New Gas Bar Canopy.
Projets (8)
To construct a 21 unit Stacked Row House building. ****Variance required for non-masonry firewall ****
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porch(s) and to develop 4 Secondary Suites in the Basement(s).
To construct a Residential Use building in the form of a 4 Dwellings Row House with unenclosed front porches, front and rear uncovered deck (Units A & D), side uncovered deck (Units B & C) and to develop 3 Secondary Suites in the Basements (Units A, B & D), and Basements Development (Unit C) (NOT to be used as an additional Dwelling).
To move on Two(2) modular classrooms to a Public Education Services Building. Includes creating a link to the main school. - "St. Bernadette School". Separate permit required for the removal of modulars from Bishop Savaryn School.
To Construct a new commercial building for child care services.
To Construct a New Gas Bar Canopy.
To construct a SHELL ONLY retail building (3 CRU's, 1 one hour demising walls, 3 RTU's, 3 GM's. [Washrooms and one 1 hour demising wall removed from scope Jan.23/2023] Fire alarm removed March 18/2024]
To construct a new bakery building (lots 4,5), and construct exterior alterations to an existing retail building (lots 1,2) for Italian Bakery. Scope of work includes one 4hr firewall, 1 rooftop unit, and 1 BF washroom. Maximum occupant load 10 people.