Nouvelles constructions et développements à Kennedale Industrial, Edmonton
10
projets suivis
13
logements proposés
10
en progression
2025-06-16
dernière activité
En date du 2025-06-16, 10 projets de construction majeurs ont été autorisés par permis dans le secteur Kennedale Industrial, totalisant 13 logements. Le plus important : un projet mixte de 13 logements au 12918 50 Street NW. 7 sont des constructions neuves. Usages : 2 commercial, 1 mixte.
Données actualisées le · Les données
Activité récente
To construct a new commercial assembly building (A2 occupancy) with drive-through services (shell ONLY) for a future restaurant operation - Church’s Chicken (Kennedale) - 2 RTUs NOTE: Tenant fit-up NOT included and requires separate permits
To construct a General Industrial Use building. "Nortalta integrated services limited"
To construct interior and exterior alterations to convert a commercial building to a mixed use commercial building (Mercantile, Business and Personal Service, Assembly, Residential, Parking Garage). 15 RTU's 1st Floor - Work/Living Units 1-13 complete, CRU 1 Restaurant (existing, No changes being made), CRU 2,3,4,5 SHELL ONLY Require Separate permits for tenant fit up 2nd floor- Work/Living Units 2-13 complete, Unit 205 (New Psychology), Unit 202(dentist), Unit 208(Denture Clinic) existing selective demo for HVAC, sprinkler, and fire alarm upgrades. Unit 213 (Existing Psychology) Units 206, 220, 221 Require separate permits for tenant fit up
To construct a General Industrial use storage building.
To construct a General Industrial Use building containing 10 suites w/ mezzanines (Palermo Building)
Projets (10)
To construct interior and exterior alterations to convert a commercial building to a mixed use commercial building (Mercantile, Business and Personal Service, Assembly, Residential, Parking Garage). 15 RTU's 1st Floor - Work/Living Units 1-13 complete, CRU 1 Restaurant (existing, No changes being made), CRU 2,3,4,5 SHELL ONLY Require Separate permits for tenant fit up 2nd floor- Work/Living Units 2-13 complete, Unit 205 (New Psychology), Unit 202(dentist), Unit 208(Denture Clinic) existing selective demo for HVAC, sprinkler, and fire alarm upgrades. Unit 213 (Existing Psychology) Units 206, 220, 221 Require separate permits for tenant fit up
To construct a new commercial assembly building (A2 occupancy) with drive-through services (shell ONLY) for a future restaurant operation - Church’s Chicken (Kennedale) - 2 RTUs NOTE: Tenant fit-up NOT included and requires separate permits
To construct a General Industrial Use building. "Nortalta integrated services limited"
To construct a General Industrial use storage building.
To construct a General Industrial Use building containing 10 suites w/ mezzanines (Palermo Building)
To construct an Addition (111 m2)to an existing Commercial building (Includes opening portion of West exterior wall, constructing a ramp and two overhead doors for loading dock bay, add new overhead door on the south elevation, and Facade Improvement).
To construct a new General industrial building - F-3. Non-Combustible Storage/Workshop for RTM Electrical
To construct an addition to a Minor Impact Utility Service building (Epcor). 2 RTU's on roof. 1 Storey addition with basement
To construct a general Industrial use shell building, "Vinton Carpets"; (no washroom, 2 unit heater)
To construct a two-storey addition (455.22 sq.m.) and interior alterations to an existing General Industrial building.