1021 Hayter Road NW — development project
This industrial project (new construction) at 1021 Hayter Road NW, in the Clover Bar Area neighbourhood, has been the subject of 5 applications before City of Edmonton's building-permit process between 2016-03-15 and 2019-09-11. Estimated construction value: $28.4M. Status: advancing — latest status: Issued. Application types: Addition — Commercial Final, New — Commercial Final.
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (5)
2019-09-11 — New — Commercial Final
· Issued (7-300242003)
To construct a General Industrial Use (maintenance and office) building. New 4 story maintenance building with offices, storage area and paint spray booth. Also to demolish 2 metering stations and pipe trench.
2017-06-27 — New — Commercial Final
· Issued (13-165889867)
To construct a General Industrial building with a link to adjacent building (Gilead chemical synthesis plant F&F Permit# -007).
2016-10-04 — New — Commercial Final
· Issued (1-225867023)
To construct exterior alterations to an existing General Industrial Use Building, "Gilead Alberta" (lean-to under existing pipe rack).
2016-07-22 — Addition — Commercial Final
· Issued (6-165889867)
To construct FOOTINGS and FOUNDATION for a General Industrial building (Gilead chemical synthesis plant).
2016-03-15 — Addition — Commercial Final
· Issued (1-182993989)
To construct an addition to an industrial building (lunchroom expansion) - Gilead ULC.
Other projects in Clover Bar Area
To Demolish a General Industrial Use Building (Plant and Warehouse) and multiple Accessory Buildings and Structures
To Construct a new general industrial building.
To construct an addition to a Cold Storage Accessory building, two independent free standing structures, collectively one building area and classification. Identified as a Compressor, PPE Storage and Electrical Services storage and to demolish a pre-existing structure, collectively under a single permit.
To construct an addition to the existing General Industrial Use building Gilead (Phase 2); laboratory addition.
To construct a General Industrial Building (ISLZ Logistics Ltd.) located in outside ten minutes area. Outside 10 minute response time.
To construct an accessory storage structure, and temporarily store a site trailer on the site. (Maximum of 2 Years).
To construct a TEMPORARY structure (100' x 50'- metal side walls/fabric covered roof) structure for STORAGE ONLY - Rebel Heart Trucking. NOTE: permit expires Sep 2, 2029.
To construct an Accessory building (office / control building) to an existing General Industrial Use (ALBERTA DILUENT TERMINAL)