This other project (site plan control) at 667 Bank, in the Glebe-Dows Lake neighbourhood (Ward 17 district), has been the subject of 1 application before City of Ottawa's development-application process at its 2016-08-04 meeting. Status: advancing — latest status: Approval Lapsed - No Building Permit Issued. Application type: Site Plan Control.

Filing history (1)

2016-08-04 — Site Plan Control · Approval Lapsed - No Building Permit Issued (D07-12-16-0118)

Other projects in Glebe-Dows Lake

The proposed development consists of a 26-storey mixed-use building along Bronson Avenue and extending west to Cambridge Street South, stepping down to four (4) storeys adjacent to the low-rise neighbourhood. A total of 328 units are proposed within the building which is to be constructed in two phases.
328 units26 storeysmixed-useadvancing
Site Plan Controllatest activity 2021-07-192 filing(s) project page file D07-12-21-0108
The City of Ottawa has received a Site Plan Control application to facilitate the construction of a 19-storey high-rise residential building with 229 units, three visitor at-grade parking spaces and 99 vehicular and 242 bicycle parking spaces located in two underground garage levels.
229 units19 storeysresidentialunder review
Zoning By-law Amendment, Site Plan Controllatest activity 2026-02-032 filing(s) project page file D07-12-26-0009
A Site Plan Control application to construct a 16-storey mixed-use building with 160 residential apartment units and 313 square metres of at-grade commercial space. 8 at-grade- and 70 underground parking spaces and 163 bicycle parking spaces are proposed.
160 units16 storeysmixed-useadvancing
Zoning By-law Amendment, Site Plan Controllatest activity 2023-06-023 filing(s) project page file D07-12-23-0069
A Site Plan Control application is submitted to convert the existing 8-storey commercial use building into a mixed-use building consisting of main-floor commercial uses and residential above.A total of 70 residential units will be provided between 2nd and 8th floors. A rooftop amenity area is also proposed. The ground floor will maintain approximately 187 SQM of GFA. Total of 35 vehicle parking and 35 bicycle parking spaces will be provided.
70 units8 storeysmixed-useadvancing
Site Plan Controllatest activity 2025-02-051 filing(s) project page file D07-12-25-0015
The owner is proposing to build a 4-storey apartment building with 19 units in it. Two parking spaces are proposed under the cantilever of floors 2 to 4. 10 bicycle parking spaces are proposed.
19 units4 storeysresidentialunder review
Site Plan Controllatest activity 2026-05-051 filing(s) project page file D07-12-26-0047
Construction of new single-detached house on severed portion of existing 160 Clemow
1 unitsresidentialunder review
Ontario Heritage Actlatest activity 2024-07-301 filing(s) project page file D09-04-24-0038
Demolition of existing non-contributing building and construction of new single detached house
1 unitsresidentialunder review
Ontario Heritage Actlatest activity 2026-02-051 filing(s) project page file D09-04-26-0005
New north side stadium stands will be constructed in place of the existing stadium stands, part of Lansdowne 2.0 project.
otheradvancing
Zoning By-law Amendment, Official Plan Amendment, Site Plan Controllatest activity 2024-12-244 filing(s) project page file D07-12-24-0178