971 Montreal, Ch De — projet de développement
Ce projet résidentiel (plan d'implantation) situé au 971 Montreal, Ch De, dans le quartier Waterridge Village (district Ward 13), a fait l'objet de 1 demande devant le processus de demande d'aménagement de la Ville d'Ottawa lors de la séance du 2021-06-29. Il prévoit 78 logements sur 9 étages. Statut : en progression — dernier statut : Request for Agreement Received. Type de demande : Site Plan Control.
Historique des demandes (1)
2021-06-29 — Réglementation du plan d'implantation
· Request for Agreement Received (D07-12-21-0094)
A Site Plan Control application to construct a nine-storey residential apartment building, containing 78 units, adjacent surface parking and a one-storey underground parking garage.
Autres projets dans Waterridge Village
The proposed development consists of two 9-storey mid-rise apartment buildings containing underground and surface parking. The building on the northwestern side of the site (Building A) will be nine storeys with 144 units, while the building on the south eastern portion of the property (Building B) will be nine storeys with 110 units for a total unit count of 254 units. The buildings will be oriented to frame a central courtyard containing greenspace, a gym, and a gravel dog run area. A walkway is also proposed that will blsect the site along a right-of-way providing convenient pedestrian circulation through the site.
Two 4 storey rental apartment buildings with 200 rental units (114 and 86 units) total on a corner lot with most resident parking underground and all visitor parking at grade.
Low-rise residential development consisting of 185 total dwellings as a planned unit development, internal private road network, 7 visitor parking spaces, soft and hard landscaping, and snow storage. Applications for site plan control and minor variance will also be submitted in support of the proposal, with the minor variance application to advance once plans are no longer anticipated to change as part of SPC process.
Low-rise residential development consisting of 111 total dwelling units (60 back-to-back townhomes and 51 rear lane townhomes) as a planned unit development (PUD), an internal private road network, 8 visitor parking spaces, soft and hard landscaping, snow storage, amenity area, and stormwater management. Applications for plan of condominium (common elements) and minor variance will also be submitted in support of the proposal, with the minor variance application to advance once plans are no longer anticipated to change as part of the site plan control process.
Plan of Subdivision
A Site Plan Control application to construct a 9-storey mixed-use building
This file is for pre-engineering works on this site.
Site Plan Control