945 Bank — projet de développement
Ce projet autre (plan d'implantation) situé au 945 Bank, dans le quartier Glebe-Dows Lake (district Ward 17), a fait l'objet de 4 demandes devant le processus de demande d'aménagement de la Ville d'Ottawa entre le 2023-06-09 et le 2024-12-24. Statut : en progression — dernier statut : Request for Agreement Received. Types de demande : Zoning By-law Amendment, Official Plan Amendment, Site Plan Control.
Historique des demandes (4)
2024-12-24 — Réglementation du plan d'implantation
· Request for Agreement Received (D07-12-24-0178)
New north side stadium stands will be constructed in place of the existing stadium stands, part of Lansdowne 2.0 project.
2024-08-08 — Réglementation du plan d'implantation
· Request for Agreement Received (D07-12-24-0082)
Lansdowne 2.0 project. The proposed development includes a new event centre that will accommodate concerts and sporting events and approximately 6,200 people, as well as a new north side stadium stand that will accommodate 12,000 spectators.
2023-06-09 — Modification au Règlement de zonage
· Application Approved by OMB (D02-02-23-0047)
2023-06-09 — Modification au Plan officiel
· Application Approved by OMB (D01-01-23-0009)
Autres projets dans Glebe-Dows Lake
The proposed development consists of a 26-storey mixed-use building along Bronson Avenue and extending west to Cambridge Street South, stepping down to four (4) storeys adjacent to the low-rise neighbourhood. A total of 328 units are proposed within the building which is to be constructed in two phases.
The City of Ottawa has received a Site Plan Control application to facilitate the construction of a 19-storey high-rise residential building with 229 units, three visitor at-grade parking spaces and 99 vehicular and 242 bicycle parking spaces located in two underground garage levels.
A Site Plan Control application to construct a 16-storey mixed-use building with 160 residential apartment units and 313 square metres of at-grade commercial space. 8 at-grade- and 70 underground parking spaces and 163 bicycle parking spaces are proposed.
A Site Plan Control application is submitted to convert the existing 8-storey commercial use building into a mixed-use building consisting of main-floor commercial uses and residential above.A total of 70 residential units will be provided between 2nd and 8th floors. A rooftop amenity area is also proposed. The ground floor will maintain approximately 187 SQM of GFA. Total of 35 vehicle parking and 35 bicycle parking spaces will be provided.
The owner is proposing to build a 4-storey apartment building with 19 units in it. Two parking spaces are proposed under the cantilever of floors 2 to 4. 10 bicycle parking spaces are proposed.
Construction of new single-detached house on severed portion of existing 160 Clemow
Demolition of existing non-contributing building and construction of new single detached house
Site Plan Control