1350 Fisher — projet de développement
Ce projet mixte (plan d'implantation) situé au 1350 Fisher, dans le quartier Fisher Heights (district Ward 9), a fait l'objet de 1 demande devant le processus de demande d'aménagement de la Ville d'Ottawa lors de la séance du 2023-06-12. Il prévoit 320 logements sur 24 étages. Statut : en progression — dernier statut : Agreement Registered - Securities Held. Type de demande : Site Plan Control.
Données actualisées le · Les données
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (1)
2023-06-12 — Réglementation du plan d'implantation
· Agreement Registered - Securities Held (D07-12-23-0076)
A Site Plan Control application has been received to construct a 24-storey mixed use high-rise on a four-storey podium and retain the existing commercial one-storey commercial plaza. Phase 1 will consist of Building A on the existing surface parking lot along Fisher Ave, and retention of the existing commercial mall. Building A is proposed at 24-storeys, sited along Fisher Ave, and will have 320 residential units with about 480 sq.m. of ground floor commercial space. The rear of the lot with frontage to Hilliard Ave will be 4-storeys in height with a townhouse form.
Autres projets dans Fisher Heights
A Site Plan Control application to construct a nine storey residential building which terraces down to six storeys adjacent to Kerry Cres., with 203 residential units. Two storeys of underground parking will be provided.
The City of Ottawa has received a Zoning By-law Amendment application to amend the site-specific zoning exception to increase the maximum permitted number of bedrooms in a dwelling unit from four to five per dwelling unit for each of the townhouse dwellings currently under construction.
Site Plan Control
Site Plan Control
Zoning By-law Amendment, Site Plan Control
The proposed development on the subject property features the development of seven {7) buildings, dedicated parkland, and an internal transportation network, to be constructed across two {2} phases of development. Phase 1 has 372 proposed units. The proposed Official Plan Amendment and Zoning Bylaw Amendment applications are intended to apply to the entirety of the lands, including both phases of development, while the future Site Plan Control applications will address 2 phases separately
Zoning By-law Amendment