8401 51 Avenue NW — projet de développement
Ce projet industriel (construction neuve) situé au 8401 51 Avenue NW, dans le quartier Mcintyre Industrial, a fait l'objet de 2 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2024-04-11 et le 2024-10-21. Valeur estimée des travaux : $1.0M. Statut : en progression — dernier statut : Issued. Types de demande : New — Commercial Final, Addition — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2024-10-21 — Addition — Commercial Final
· Issued (11-492521256)
To Install one recessed dock ramp and dock leveler structure to an existing General Industrial Building. --Spartan Controls--
2024-04-11 — New — Commercial Final
· Issued (5-492521256)
To demo/remove existing fabric covered quonset (74' x 140') and construct a new "semi heated cold storage" general use pre-eng commercial building (150' x 94') for pallet racking storage. - Spartan Controls NOTE: Racking NOT included and requires separate permit application
Autres projets dans Mcintyre Industrial
To construct Interior Alteration (new partitions, addition of gender neutral barrier free washroom, new lighting, HVAC, sprinkler alterations and parkade mechanical & electrical improvements) within an existing office building. --APEGA Office--
To construct interior alteration to an existing building for a new tenant. - Wawanesa
To construct an accessory building (seacan modified to shooting facility) - Edmonton Police Services
To construct an Office Support Service Building. (shell only, 2 rtus, no demising walls,4 bathrooms)
To construct Interior Alterations (office partitions, mechanical and electrical upgrades, upgrade full fire alarm system) in an existing office building -Graham Construction.
To construct a General Industrial use accessory building (7.15m x 7.96m), existing without permits.
To construct an addition (30.5m x 21.9m shop addition) to the existing General Industrial building. --Plainsman Manufacturing
To construct an office building - Shell only. (McIntyre office bldg.) 0-Washrooms, 0- Demising Walls, 3-RTU's