446 Mistatim Way NW — projet de développement
Ce projet commercial (construction neuve) situé au 446 Mistatim Way NW, dans le quartier Mistatim Industrial, a fait l'objet de 2 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2020-02-25 et le 2020-08-05. Valeur estimée des travaux : $1.4M. Statut : en progression — dernier statut : Issued. Types de demande : New — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2020-08-05 — New — Commercial Final
· Issued (6-270839615)
To Construct a two storey Commercial SHELL building (Proposed main floor - Child Care/Retail/Specialty Food. Second Floor - Office) - Bagga Commercial Building
2020-02-25 — New — Commercial Final
· Issued (10-284078927)
To construct a Commercial Building with SHELL SUITES for 3 General Retail Stores and 1 Restaurant (2-1 hour and 1-2 hour demising walls and 5 RTUs).
Autres projets dans Mistatim Industrial
To construct a General Industrial Use building (Warehouse & Oxidizer Storage building- Cleartech Inc.)
To construct an addition to existing office/laboratory building and construct interior alterations to existing building - Hexion Research and Development.
To remove an existing scaffolding/fabric covered structure, and to construct a 40' x 50' steel frame fabric covered structure (Quonset) in its place for unheated storage of materials only. - HEXION NOTE: permit expires September 13, 2026
To construct a new 1 storey 1,139 m2 (12,260 ft2) multi-unit CRU Commercial office building with 7 - 1 HR demising walls No MAUs- Centre 156. NOTE: CRU Tenant fit-ups NOT included and requires separate permits
To construct an industrial building SHELL ONLY ( NO RTU OR MUA )- Mistatim Land Development Bldg #1 Separate Permits required for CRU tenant fit-ups
To construct an industrial building SHELL ONLY - Mistatim Land Development Bldg #2 NOTE: separate Permits required for CRU tenant fit-ups
To construct a General Industrial building (Capital Paper Recycling Ltd.).
To construct an addition to an existing General Industrial Use building (Addition-storage bldg.).