4419 76 Avenue NW — projet de développement
Ce projet industriel (construction neuve) situé au 4419 76 Avenue NW, dans le quartier Weir Industrial, a fait l'objet de 3 demandes devant le processus de permis de construction de la Ville d'Edmonton lors de la séance du 2018-07-06. Valeur estimée des travaux : $80K. Statut : en progression — dernier statut : Issued. Types de demande : New — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (3)
2018-07-06 — New — Commercial Final
· Issued (4-113069016)
To construct 2 General Industrial Use buildings, Buildings 2 and 3 on an existing General Industrial development (Allwest Auto Parts); buildings are existing without permits.
2018-07-06 — New — Commercial Final
· Issued (7-113069016)
To construct an industrial building: Quonset storage 72'-0" x 210'-0". EXISTING WITHOUT PERMITS - Allwest Auto Parts (Building 5).
2018-07-06 — New — Commercial Final
· Issued (5-113069016)
To construct an industrial building (tent structure located at the front of site) EXISTING WITHOUT PERMITS - Allwest Auto Parts (Building 4).
Autres projets dans Weir Industrial
To construct a new 2 storey commercial retail building, and tenant fit-up. WHYTE AVE LANDSCAPE SUPPLIES
To construct an addition to an existing industrial building ("DFI Pipe Mill", existing without permits).
To construct a 184' x 60' steel frame fabric covered structure (Quonset 1) for unheated cold storage of low hazard industrial materials only. - Atco NOTE: permit expires September 21, 2027
To construct a natural gas telemetry building (unoccupied) --"ATCO Gas & Pipelines"--
To construct a General Industrial Use building (13.41 m x 6.10 m; Unheated Metal Quonset Building * Metal membrane, no fabric film * No Industrial Racking-) --"DEMIR ENGINEERING LTD."-- The seacans need separate permits.
To construct an Accessory Building - 5.00m x 2.99m Shed.
To construct two additions (East side and South-West Side wings) to a industrial building BUILT WITHOUT PERMITS) - DFI Building.
To construct a General Industrial Use building.(KS Machine fit out + 1 additional shell CRU)