3451 Gateway Boulevard NW — permis de construction et développement
Ce projet commercial (construction neuve) situé au 3451 Gateway Boulevard NW, dans le quartier Strathcona Industrial Park, a fait l'objet de 3 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2022-06-10 et le 2022-06-17. Valeur estimée des travaux : $450K. Statut : en progression — dernier statut : Issued. Types de demande : New — Commercial Final.
Données actualisées le · Les données
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (3)
2022-06-17 — New — Commercial Final
· Issued (62-298001996)
To construct of an Assembly Building with Drive Thru. 2 RTUs. SHELL ONLY. "Gateway Blvd Centre - Gateway Building #7"
2022-06-13 — New — Commercial Final
· Issued (48-298001996)
To construct of a commercial building with 2 Roof Top Units- Drive Thru Restaurant- SHELL ONLY" Gateway Blvd Centre - Gateway Building #6"
2022-06-10 — New — Commercial Final
· Issued (46-298001996)
To construct of a commercial building with 2 Roof Top Units- Drive Thru Restaurant- SHELL ONLY" Gateway Blvd Centre - Gateway Building #5"
Autres projets dans Strathcona Industrial Park
Addition to Existing Building, Exterior Alteration, Interior Alteration
To construct an addition, interior / exterior alterations to a General Industrial building. (Millwoods Professional Centre) 14 RTU's, 4 Men's / 3 Women's washrooms (2nd Floor), Coridor Walls
To construct an automotive vehicle sales/service building. - Hyundai Genesis South Edmonton
To construct a Specialty Food Service building with Drive-in Food Service, (Starbucks).
To re-construct a Cremation and Internment Services/Funeral Services Use building as a result of fire damage (Hainstock Funeral Chapel).
To construct of a new mixed use (A2/E/D) commercial building - shell only" Gateway Blvd Centre - Building #4" No demising walls 12 RTUs
To construct a cold storage tent (fabric covered steel frame structure building) on a concrete pad. - Polyphase Engineered Controls (Tundra Process Solutions)
To change the use from an E to an A2 and construct interior alterations to expand the existing restaurant into Suite 3731. (Kitchen and storage area only; the commercial kitchen is within suite 3735) --Han Jan--.