3404 158 Avenue NW — projet de développement
Ce projet commercial (construction neuve) situé au 3404 158 Avenue NW, dans le quartier Gorman, a fait l'objet de 2 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2023-03-07 et le 2026-04-10. Valeur estimée des travaux : $16.0M. Statut : en progression — dernier statut : Issued. Types de demande : New — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2026-04-10 — New — Commercial Final
· Issued (6-626988226)
To construct a new commercial building for retail shops and a Child Care Service. "Active Start Daycare" --Manning Town Centre Building #B1 --Separate Fit Ups (For Bay 1-5) Require Separate Permits
2023-03-07 — New — Commercial Final
· Issued (5-440294077)
To construct a new Indoor Participant Recreation Service building with an accessory Specialty Food Service with an outdoor patio. Includes pool facility. "Movati Athletic"
Autres projets dans Gorman
To construct a 12 dwelling stacked row house building with front attached garages.
To construct a Residential Use building in the form of a Multi-unit Housing with attached Garages. Total of 12 Dwellings (Bldg #3)
To construct a new single storey single tenant "shell ONLY" commercial building (includes 3 RTU's) Manning Building L3 CRU Tenant fit-up NOT included and requires separate permits. No demising walls included.
To construct a 1 storey SHELL General Retail Stores and Restaurant (Tim Hortons) with a Drive-in Food Services Use building ("Building M1", 7 RTUs, 2 hr demising wall along grid line 3,5,6,7 only).
To construct an Addition to a General Retail commercial building. Shell only, 3 RTU's, 1 hour demising wall on grid line 22.
To construct a two-storey multi-use commercial building SHELL ONLY (with only 1 hr FSR on the main floor at gridline#1-E and GL-1G and 12 RTUs), including FUTURE Health Service and General Retail Stores on the main floor, and FUTURE Child Care Services (100) on the 2nd floor --"Building #1- Gorman Commercial Development"
To construct a new 7-ELEVEN Gas Bar canopy.
To construct a new single storey multiple tenant (8 CRU's) commercial retail building (SHELL ONLY with three 1hr FRR demising walls) and 10 RTUs. -- Building #2 (Gorman Commercial Development)-- NOTE: Separate Permits required for CRU tenant fit-ups, future demising walls, and gas bar canopy.