2545 Aurum Road NE — projet de développement
Ce projet industriel (rénovation) situé au 2545 Aurum Road NE, dans le quartier Clover Bar Area, a fait l'objet de 2 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2022-04-21 et le 2025-12-22. Valeur estimée des travaux : $11.0M. Statut : en progression — dernier statut : Issued. Types de demande : Interior Alterations — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2025-12-22 — Interior Alterations — Commercial Final
· Issued (1-624889058)
To construct Exterior and Interior Alterations to an existing General Industrial Use Building. Scope of work only on Bay 3 to create 3 new levels. Level 1&2 shell space and Level 3 Offices. "EPCOR Integrated Operations Center-Building 1" SEPARATE PERMIT REQUIRED FOR TEMPORARY ASSEMBLY SPACE.
2022-04-21 — Interior Alterations — Commercial Final
· Issued (1-417823788)
To complete exterior alterations (exterior sliding doors to be removed, infilled and new overhead doors to be installed) and interior alterations (construct new rooms, offices, and fleet parking areas, within the building warehouse area) of existing building - Epcor Aurum Road Campus (building 1)
Autres projets dans Clover Bar Area
To Demolish a General Industrial Use Building (Plant and Warehouse) and multiple Accessory Buildings and Structures
To construct a General Industrial Use (maintenance and office) building. New 4 story maintenance building with offices, storage area and paint spray booth. Also to demolish 2 metering stations and pipe trench.
To Construct a new general industrial building.
To construct an addition to a Cold Storage Accessory building, two independent free standing structures, collectively one building area and classification. Identified as a Compressor, PPE Storage and Electrical Services storage and to demolish a pre-existing structure, collectively under a single permit.
To construct an addition to the existing General Industrial Use building Gilead (Phase 2); laboratory addition.
To construct a General Industrial Building (ISLZ Logistics Ltd.) located in outside ten minutes area. Outside 10 minute response time.
To construct an accessory storage structure, and temporarily store a site trailer on the site. (Maximum of 2 Years).
To construct a TEMPORARY structure (100' x 50'- metal side walls/fabric covered roof) structure for STORAGE ONLY - Rebel Heart Trucking. NOTE: permit expires Sep 2, 2029.