14440 123 Avenue NW — projet de développement
Ce projet industriel (agrandissement) situé au 14440 123 Avenue NW, dans le quartier Dominion Industrial, a fait l'objet de 1 demande devant le processus de permis de construction de la Ville d'Edmonton lors de la séance du 2017-08-10. Valeur estimée des travaux : $850K. Statut : en progression — dernier statut : Issued. Type de demande : Addition — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (1)
2017-08-10 — Addition — Commercial Final
· Issued (4-240117280)
To construct an addition (622.3 sqm) to an existing General Industrial building ("I Mark Architectural Metals").
Autres projets dans Dominion Industrial
To construct an addition (952 sqft Cold Storage Addition) to a General Industrial Use building (WESCOR SALES LTD - WESCOR FOOD EQUIPMENT).
To construct a General Contractor/warehouse Service building. "SVM New Warehouse" 2 - 2 Hr demising walls and 1 - 1 Hr demising wall
CLU - To construct exterior alterations (front addition and RTU's) and to construct interior alterations (partition walls) to an existing commercial building - Russell Hendrix Restaurant Equipment and Supplies
To construct an Addition to an Existing Building - Canada Post Vestibule
To change the use from General Contractor Services to General Industrial and to construct an addition and interior alterations (new offices in existing building and manufacturing/workshop addition (267.56m2)).
To construct interior and exterior alterations (two new elevators with rooftop housing, new interior finishes, removal/addition of partition walls, and new windows on east and south exterior walls of second floor) to the "Alberta Government Learning Resource Centre" building.
To construct a new 40'x140' open storage (Lean-To with a roof and one side wall) addition to an existing commercial building. - Pacific West Systems Supply Ltd
To construct a General Industrial Use building and fit up offices in the front of combined units 1 and 2. (2 RTU's over units 1 and 2 and 2 RTU curbs for future RTU's over units 3 and 4. 1 demising wall with a 1 hour fire separation between units 2 and 3.)