Ce projet industriel (construction neuve) situé au 14219 109 Avenue NW, dans le quartier Mcqueen, a fait l'objet de 2 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2015-12-08 et le 2016-09-21. Valeur estimée des travaux : $100K. Statut : en progression — dernier statut : Issued. Types de demande : New — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2016-09-21 — New — Commercial Final
· Issued (1-111874527)
To construct an accessory building (metal shed) to a Public Education Service Building
2015-12-08 — New — Commercial Final
· Issued (2-180775182)
To construct a storage building Accessory to an existing Public Education Services Use building. (Archbishop MacDonald)
Autres projets dans Mcqueen
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porch(s), to develop 3 Secondary Suites in the basement(s), and one basement development (Unit D, NOT to be used as an additional Dwelling). POLICY B23-01
To construct a Residential Use building in the form of a 3 Dwelling Row House with 3 secondary suites and unenclosed front porch. Policy B23-01
To construct a Residential Use building in the form of a 3 Dwelling Row House with 3 secondary suites and unenclosed front porch.( Policy B23-01)
To construct a Multi-unit Housing development (4 dwelling back-to-back rowhouse). (Units 1-4)
To construct a commercial building SHELL ONLY for future retail and restaurant (2hrs demising wall on gridline #D, 3 RTU's and 0 Washrooms) - Glenora Circle.
To complete an addition (move on-site a 24'x40' portable pre-fabricated modular unit) and to construct a non-heated connecting corridor between the existing school and portable, located at an existing Public Education school site (Thrive Elementary School)
To change the use from a D use to A2, To construct an rear addition (~21.65sqm), and to construct exterior alterations (Elevator Tower, Entry Canopy Addition, Landscaping and parking renovations) --Jewish Community Center of Edmonton-- Selective Interior Demolition (SID) PERMISSION - Effective Dec 3, 2025.
To construct a new accessory building (cold storage ONLY) on the property of an existing Education building (Edmonton Christian West School) - School accessory storage building