13808 111 Avenue NW — projet de développement
Ce projet commercial (rénovation) situé au 13808 111 Avenue NW, dans le quartier Woodcroft, a fait l'objet de 2 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2022-07-11 et le 2023-12-04. Valeur estimée des travaux : $20.0M. Statut : en progression — dernier statut : Issued. Types de demande : Interior Alterations — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (2)
2023-12-04 — Interior Alterations — Commercial Final
· Issued (1-483404755)
To construct interior and exterior alterations, rehabilitate, renovate and upgrade architectural, structural, mechanical and electrical systems in an existing public swimming pool building. "Peter Hemingway TP4 Phase 2"
2022-07-11 — Interior Alterations — Commercial Final
· Issued (1-422506781)
To construct Interior Alterations to an existing leisure center.- Peter Hemmingway Fitness & Leisure Centre
Autres projets dans Woodcroft
To construct a 5 story combustible apartment building (69 dwellings) on a 1 story underground parkade - Brentwood Redevelopment - Bldg #W2. To include solar install.
To construct a Residential Use building in the form of a 4 Dwelling Row House with 4 secondary suites and unenclosed front porches. POLICY B23-01
To construct an Accessory structure to a School (22 m2 Greenhouse structure in the courtyard of Ross Sheppard High School)
To construct a 1 story addition (new Aurora area), exterior alterations (rooftop solar install on original building portion) and interior alterations (reno to existing exhibition space and front lobby), to an existing assembly use building - TELUS WORLD OF SCIENCE.
To construct an addition (64.0 m2) and interior/exterior alterations to an existing restaurant - McDonalds.
To construct a 1 storey building with 2 interior demising walls (total of 3 CRU's for restaurant A2 occupancy)
To construct Exterior Alterations (constructing a new parking area on west side of the site, changing parking design on east side of building) and Interior Alterations (demolition of part of existing Westmount Shopping Centre, constructing new Indoor Sales and Services and entrances) to an existing building. ”Westmount Centre | Building 2” **Interior fit ups require separate permits.**
To construct an indoor recreational building (velodrome) including the connecting link/above ground pedway to the adjacent building. "Coronation Park Sports and Recreation Centre" (Separate permits are required for solar panels).