10977 50 Street NW — projet de développement
Ce projet industriel (construction neuve) situé au 10977 50 Street NW, dans le quartier River Valley Gold Bar, a fait l'objet de 13 demandes devant le processus de permis de construction de la Ville d'Edmonton entre le 2015-09-17 et le 2025-07-09. Valeur estimée des travaux : $6.4M. Statut : en progression — dernier statut : Issued. Types de demande : Addition — Commercial Final, New — Commercial Final, Interior Alterations — Commercial Final.
Emplacement et projets à proximité
● ce projet · ○ projets à proximité — cliquez sur un point pour ouvrir sa fiche
Historique des demandes (13)
2025-07-09 — New — Commercial Final
· Issued (3-538721265)
To construct a Major Utility building to the Gold Bar Wastewater Water Treatment Plant. "Flare Biogas Building"
2025-05-09 — New — Commercial Final
· Issued (4-520339734)
To construct a new utility building located at the Gold Bar Wastewater Treatment Plant (EB-1, Electrical Building) --EPCOR--
2024-11-21 — New — Commercial Final
· Issued (3-513672749)
To construct a new utility (air intake) building for the secondary Aeration Blower Upgrade located at the Gold Bar Waste Water Treatment Plant - Epcor.
2023-05-16 — New — Commercial Final
· Issued (18-405715038)
To construct an Accessory Building (13m x5 m) to house compressors. "Gold Bar Wastewater Treatment Plant"
2022-11-07 — Addition — Commercial Final
· Issued (9-422853802)
*** To construct an addition to an existing facility (to move-on to site TRAILER UNITS- Only offices uses) that is connected via vestibule to the Hygiene Facility. --"EPCOR GoldBar Waste Water Treatment Plant - Hygiene Facility Upgrades" -- **** Interior alterations to EPCOR GB Maintenance Hygiene Facilities 421575129-002****
2022-08-11 — New — Commercial Final
· Issued (3-434529197)
To construct a 36.10 sq.m Major Impact Utility Service Facility built on top of underground tunnel. "EPCOR Goldbar Wastewater Treatment Plant"
2022-07-22 — Interior Alterations — Commercial Final
· Issued (1-421564715)
To construct Interior Alterations. "EPCOR GB Maintenance Hygiene Facilities" **** Temporary trailers require separate permits 422864216-010***** **** DP - 422864216-002
2022-05-17 — New — Commercial Final
· Issued (4-405715038)
To construct an Accessory Building (Gold Bar Wastewater Treatment Plant)- "Square 1 Biogas System Upgrades- Building #1 ( 8.45m x6.6 m) ; Sediment Building"
2021-12-17 — New — Commercial Final
· Issued (4-393676679)
To construct an industrial building (wet [odour] scrubber building) - EPCOR Goldbar Wastewater Treatment Plant).
2021-09-29 — Addition — Commercial Final
· Issued (7-392521637)
To construct an Addition, Interior and exterior alterations to an Existing Building - EPCOR Operation Centre - New 2 Storey office/control room structure with new exit stairs, barrier free washrooms, locker rooms, rooftop patio.
2020-02-20 — New — Commercial Final
· Issued (4-342025601)
To construct an unusual structure: an exterior elevated platform for pipe rack network (Gold Bar Waste Water Treatment Plant )
2016-04-08 — New — Commercial Final
· Issued (3-184787458)
To construct a Minor Impact Utility Services building (Hydovac Sanitary Grit Treatment Facility; Gold Bar Wastewater Treatment Plant).
2015-09-17 — Addition — Commercial Final
· Issued (1-157156416)
To construct an addition to the existing Major Impact Utility Services Use building (enclosing existing water treatment infrastructure; adding an electrical penthouse and access stairwell). Post Disaster Building.
Autres projets dans River Valley Gold Bar
To construct an Accessory Building (Shelter for Pump House) for an existing Outdoor Participant Recreation Service (Edmonton Nordic Ski Club).