Nouvelles constructions et développements à Winterburn Industrial Area West, Edmonton
23
projets suivis
23
en progression
2026-06-23
dernière activité
En date du 2026-06-23, 23 projets de construction majeurs ont été autorisés par permis dans le secteur Winterburn Industrial Area West. 20 sont des constructions neuves. Usages : 5 commercial, 1 institutionnel.
Données actualisées le · Les données
Activité récente
To construct a new one storey 55' x 40' (2,200 sq. ft.) enclosed cold storage accessory building with mezzanine (no heat, plumbing or power). "10702 Blounas Holdings - Building 2" NOTE: Shell only, existing without permits.
To construct a new 2 storey, 740 m2 industrial building (vehicle repair shop and office). "Tavleen Transport Ltd"
To construct an office building (40' x 60' ) EXISTING WITHOUT PERMITS - Wiebe Construction Office.
To construct a 2 storey office addition EXISTING WITHOUT PERMITS to an existing commercial warehouse building. (NOTE: Garage addition requires separate permit)
To construct a 24' x 70' (1,680ft2) enclosed post framed lean-to roof addition for cold storage ONLY, located on the north side of an existing commercial building (UCHAN TRANSPORT LTD.).
Projets (23)
To construct a new one storey 55' x 40' (2,200 sq. ft.) enclosed cold storage accessory building with mezzanine (no heat, plumbing or power). "10702 Blounas Holdings - Building 2" NOTE: Shell only, existing without permits.
To construct a new 2 storey, 740 m2 industrial building (vehicle repair shop and office). "Tavleen Transport Ltd"
To construct an office building (40' x 60' ) EXISTING WITHOUT PERMITS - Wiebe Construction Office.
To construct a 2 storey office addition EXISTING WITHOUT PERMITS to an existing commercial warehouse building. (NOTE: Garage addition requires separate permit)
To construct a 24' x 70' (1,680ft2) enclosed post framed lean-to roof addition for cold storage ONLY, located on the north side of an existing commercial building (UCHAN TRANSPORT LTD.).
To construct an Addition (12.1m x 18.2m) to an existing building. ”HCH Hydraulics Ltd.”
To construct a general industrial building. BUILT WITHOUT PERMITS
To temporarily move on site a factory-constructed modular Building (12' x 40' office trailer) on a General Industrial use site. This permit will expire on December 11, 2026.
To construct an industrial storage building - U-Haul.
*** To construct a General Industrial Use building.
To construct an Addition (existing without permits) to Existing Building - RPM Holdings Inc Winterburn building - Add a wash bay to existing building
To move on site a TEMPORARY OFFICE TRAILER Altus Auto Recycling. (Permit expires March 1 2026)
To construct an industrial building BUILT WITHOUT PERMITS - Prowest Shipping & Packaging Ltd. 2 Roof top units, 1 Make up air unit.
To construct an industrial building (office/warehouse) - T-Bar Contracting Ltd.
To construct an industrial building (trailer shop for "Shadowline Transportation Group").
To construct a General Industrial use building. BUILT WITHOUT PERMITS
To construct an addition to an existing General Industrial Use building, existing without permit. (Marden Building)
To construct a Truck and Mobile Home Sales/Rentals building.
To construct a cold storage building, "Lafarge" - Winterburn Ready-Mix Truck Enclosure. 100' x 240'.
To construct a General Industrial Use Building. Building "A" @ U-Haul 218 Street.
To construct a Minor Impact Utility Services Use building (EPCOR Training Facility).
To construct three Accessory Buildings, Accessory to an existing General Industrial Use (3 new concrete silos)
To construct a 22SqM addition and exterior alterations to an existing Motel (expansion of dining area; install privacy screening)