Nouvelles constructions et développements à Winterburn Industrial Area West, Edmonton
23
projets suivis
23
en progression
2026-06-23
dernière activité
En date du 2026-06-23, 23 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Winterburn Industrial Area West. 20 sont des constructions neuves et 23 sont en progression. Usages : 5 commercial, 1 institutionnel.
Activité récente
To construct a new one storey 55' x 40' (2,200 sq. ft.) enclosed cold storage accessory building with mezzanine (no heat, plumbing or power). "10702 Blounas Holdings - Building 2" NOTE: Shell only, existing without permits.
To construct a new 2 storey, 740 m2 industrial building (vehicle repair shop and office). "Tavleen Transport Ltd"
To construct an office building (40' x 60' ) EXISTING WITHOUT PERMITS - Wiebe Construction Office.
To construct a 2 storey office addition EXISTING WITHOUT PERMITS to an existing commercial warehouse building. (NOTE: Garage addition requires separate permit)
To construct a 24' x 70' (1,680ft2) enclosed post framed lean-to roof addition for cold storage ONLY, located on the north side of an existing commercial building (UCHAN TRANSPORT LTD.).
Projets (23)
To construct a new one storey 55' x 40' (2,200 sq. ft.) enclosed cold storage accessory building with mezzanine (no heat, plumbing or power). "10702 Blounas Holdings - Building 2" NOTE: Shell only, existing without permits.
To construct a new 2 storey, 740 m2 industrial building (vehicle repair shop and office). "Tavleen Transport Ltd"
To construct an office building (40' x 60' ) EXISTING WITHOUT PERMITS - Wiebe Construction Office.
To construct a 2 storey office addition EXISTING WITHOUT PERMITS to an existing commercial warehouse building. (NOTE: Garage addition requires separate permit)
To construct a 24' x 70' (1,680ft2) enclosed post framed lean-to roof addition for cold storage ONLY, located on the north side of an existing commercial building (UCHAN TRANSPORT LTD.).
To construct an Addition (12.1m x 18.2m) to an existing building. ”HCH Hydraulics Ltd.”
To construct a general industrial building. BUILT WITHOUT PERMITS
To temporarily move on site a factory-constructed modular Building (12' x 40' office trailer) on a General Industrial use site. This permit will expire on December 11, 2026.
To construct an industrial storage building - U-Haul.
*** To construct a General Industrial Use building.
To construct an Addition (existing without permits) to Existing Building - RPM Holdings Inc Winterburn building - Add a wash bay to existing building
To move on site a TEMPORARY OFFICE TRAILER Altus Auto Recycling. (Permit expires March 1 2026)
To construct an industrial building BUILT WITHOUT PERMITS - Prowest Shipping & Packaging Ltd. 2 Roof top units, 1 Make up air unit.
To construct an industrial building (office/warehouse) - T-Bar Contracting Ltd.
To construct an industrial building (trailer shop for "Shadowline Transportation Group").
To construct a General Industrial use building. BUILT WITHOUT PERMITS
To construct an addition to an existing General Industrial Use building, existing without permit. (Marden Building)
To construct a Truck and Mobile Home Sales/Rentals building.
To construct a cold storage building, "Lafarge" - Winterburn Ready-Mix Truck Enclosure. 100' x 240'.
To construct a General Industrial Use Building. Building "A" @ U-Haul 218 Street.
To construct a Minor Impact Utility Services Use building (EPCOR Training Facility).
To construct three Accessory Buildings, Accessory to an existing General Industrial Use (3 new concrete silos)
To construct a 22SqM addition and exterior alterations to an existing Motel (expansion of dining area; install privacy screening)