Nouvelles constructions et développements à Morin Industrial, Edmonton
11
projets suivis
11
en progression
2025-03-04
dernière activité
En date du 2025-03-04, 11 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Morin Industrial. 4 sont des constructions neuves et 11 sont en progression. Usages : 6 commercial.
Activité récente
To complete Change of Use (F2 to A2) for existing building B, and construct a new addition and Interior & Exterior Alterations to combine buildings A & B, and increase number of golf simulator spaces. "Golf Factory"
To construct a 4-storey Indoor Self Storage building with Vehicle Support Service (Super Centre Self Storage & Car Wash Inc).
To construct additions, exterior, and interior alterations to Automotive and Minor Recreation Vehicle Sales/Rentals (West Edmonton Hyundai).
To construct an Addition to Existing Building (F2 Warehouse- 294 sq m )
To construct an General Industrial Use Building (a repair shop building, Finning Canada Welding and Track Repair Shop)
Projets (11)
To complete Change of Use (F2 to A2) for existing building B, and construct a new addition and Interior & Exterior Alterations to combine buildings A & B, and increase number of golf simulator spaces. "Golf Factory"
To construct a 4-storey Indoor Self Storage building with Vehicle Support Service (Super Centre Self Storage & Car Wash Inc).
To construct additions, exterior, and interior alterations to Automotive and Minor Recreation Vehicle Sales/Rentals (West Edmonton Hyundai).
To construct an Addition to Existing Building (F2 Warehouse- 294 sq m )
To construct an General Industrial Use Building (a repair shop building, Finning Canada Welding and Track Repair Shop)
To construct an addition to an existing General Industrial Uses building. Addition of 1857.4 m2 ( 103.5 feet x 193.1 feet x 29 feet one storey height) to an Existing 1212.8 m2 (Two storey height). The new addition of 1857.4 m2 contains 6 RTUs, and one MUA. The Existing 1212.8 m2 portion has some office renovations 93 m2 including: interior, structural, and fire alarms system alteration work. The existing and the addition to be operated by a single tenant.
To construct a new Automotive and Equipment Repair Building. (Edmonton Motors).
To construct an automotive dealership ("West End Nissan"; new location).
To construct addition, interior and exterior alteration to an existing Gas Bar
To construct an addition to an existing General Industrial and Indoor Participant Recreation Service building and to construct exterior alterations (3211sq.m. SHELL ONLY Warehouse Addition; 1 Firewall, 0 washrooms, 0 RTU's, additional parking areas).
To construct a small addition to an existing General Industrial building, and to construct interior alterations.