Nouvelles constructions et développements à Mitchell Industrial, Edmonton
10
projets suivis
10
en progression
2025-09-19
dernière activité
En date du 2025-09-19, 10 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Mitchell Industrial. 6 sont des constructions neuves et 10 sont en progression. Usages : 4 commercial.
Activité récente
To construct an Addition (cold storage-680m2) to an existing building. --Milron--
To construct a "cold storage" steel frame structure building ("Truck Reception and Loading Area") at an existing waste transfer facility - Claystone Waste.
To Construct an Accessory Building (Cold Storage Garage- NOT to be used as a repair garage) - ACAW Exterior Garage
To Construct a new Commercial building - George's Ditching
To construct a Professional, Financial and Office Support Service Building - ACAW. 2 separate tenant suites with only East side T.I being developed in this application - 1 demising wall (non rated D to D), 2 RTU's, 1 a/c unit, 1 gas meter
Projets (10)
To construct an Addition (cold storage-680m2) to an existing building. --Milron--
To construct a "cold storage" steel frame structure building ("Truck Reception and Loading Area") at an existing waste transfer facility - Claystone Waste.
To Construct an Accessory Building (Cold Storage Garage- NOT to be used as a repair garage) - ACAW Exterior Garage
To Construct a new Commercial building - George's Ditching
To construct a Professional, Financial and Office Support Service Building - ACAW. 2 separate tenant suites with only East side T.I being developed in this application - 1 demising wall (non rated D to D), 2 RTU's, 1 a/c unit, 1 gas meter
To construct interior & exterior alterations to a transit bus garage building ("ETS Mitchell Garage"; modernization of electrical and mechanical systems; restoration and upgrading of concrete; structural steel modifications; skylight & glazing replacements; and installation of a new wheelchair lift).
To construct and operate a General Industrial Use Building (Building 2- 33,964 m2) (No demising wall, No washrooms, 7 Future Roof top units)
To construct an industrial building ("Norwesco Centre").
To construct a wharehouse addition to a General Industrial Use building.
To construct an addition to an existing Office building (main floor storage area and mezzanine for Environmental Dyanmics Ltd.).