Nouvelles constructions et développements à Kinokamau Plains Area, Edmonton
12
projets suivis
1
logements proposés
12
en progression
2026-04-17
dernière activité
En date du 2026-04-17, 12 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Kinokamau Plains Area, totalisant 1 logements proposés. Le plus important : un projet institutionnel de 1 logements au 12130 184 Street NW. 9 sont des constructions neuves et 12 sont en progression. Usages : 2 commercial, 1 institutionnel.
Activité récente
To construct an ADDITION, Exterior Alterations (new exit doors near GL 8 & 15) and Interior Alterations (partial renovation) to an existing Recycling Depot building (WELF).
To construct a new commercial warehouse building (package & courier logistical service terminal) - TFI International/Canpar Courier. NOTE: warehouse racking NOT included in scope and requires separate permit application
To construct three (3) Accessory buildings (Alternative Low Carbon Fuels storage building, fire protection building and electrical building only) "Edmonton Lehigh Cement Plant"
To construct a General Industrial Use building. SHELL ONLY- No washrooms, No demising walls, no RTUs "Northport Building #E"
To construct a General Industrial use building "SHELL ONLY" (Horizon Business Park - Building# F -(No Demising walls(Building Designed with 60 m Travel), NO RTUs)
Projets (12)
To construct a Limited Custodial Home (maximum 5 residents) and to demolish three Accessory buildings (garage and sheds).
To construct an ADDITION, Exterior Alterations (new exit doors near GL 8 & 15) and Interior Alterations (partial renovation) to an existing Recycling Depot building (WELF).
To construct a new commercial warehouse building (package & courier logistical service terminal) - TFI International/Canpar Courier. NOTE: warehouse racking NOT included in scope and requires separate permit application
To construct three (3) Accessory buildings (Alternative Low Carbon Fuels storage building, fire protection building and electrical building only) "Edmonton Lehigh Cement Plant"
To construct a General Industrial Use building. SHELL ONLY- No washrooms, No demising walls, no RTUs "Northport Building #E"
To construct a General Industrial use building "SHELL ONLY" (Horizon Business Park - Building# F -(No Demising walls(Building Designed with 60 m Travel), NO RTUs)
To complete 9 separate Additions (4 new evaporator SIDE building enclosures, 2 NEW ROOF TOP evaporative enclosures, 2 Roof Top penthouse evaporator replacements, and 1 addition to the compressor SIDE building room) and to complete interior alterations (Upgrades to refrigeration/Elect. & alarm system) in an existing Industrial Building. -''Co-op Distribution Warehouse''
To construct a 1 storey Industrial Shell Only(F2). (Building "E" - No demising walls, No RTU's)
To construct an addition to a General Industrial Use Building.
To construct a Group Home (12 residents)
To construct a General Industrial Use building, Pallet Shop, "Lone Star Lumber".
To construct an industrial building - Trailer Wizards.