Nouvelles constructions et développements à Hays Ridge Area, Edmonton
8
projets suivis
158
logements proposés
8
en progression
2026-09-28
dernière activité
En date du 2026-09-28, 8 projets de construction majeurs ont été autorisés par permis dans le secteur Hays Ridge Area, totalisant 158 logements. Le plus important : un projet résidentiel de 150 logements au 101, 3046 Hays Ridge Drive SW. 8 sont des constructions neuves. Usages : 3 résidentiel, 4 commercial, 1 institutionnel.
Données actualisées le · Les données
Activité récente
To construct an Accessory building (Garbage Enclosure) at a Multi-unit Housing site, Aspire.
To construct a two-storey school (Public Education Service Use building). "Hays Ridge K-9 School"
To Construct a new Commercial building - Jagare Ridge CRU 7 - SHELL BUILDING ONLY - Single Storey Base building with Automotive & Equipment Repair Shop and General Retail Tenants. 2 Roof top units ONLY, Mechanical room, 1-2Hr demising wall, 1-1Hr interior tenant wall.
To construct a general retail commercial building, ''Save On Foods''.
To construct a 4 Dwelling unit Row House with rear attached Garages and verandas.
Projets (8)
To construct an Accessory building (Garbage Enclosure) at a Multi-unit Housing site, Aspire.
To construct a 4 Dwelling unit Row House with rear attached Garages and verandas.
To construct a 4 Dwelling Row House with verandas, fireplaces, and rear attached Garages
To construct a two-storey school (Public Education Service Use building). "Hays Ridge K-9 School"
To Construct a new Commercial building - Jagare Ridge CRU 7 - SHELL BUILDING ONLY - Single Storey Base building with Automotive & Equipment Repair Shop and General Retail Tenants. 2 Roof top units ONLY, Mechanical room, 1-2Hr demising wall, 1-1Hr interior tenant wall.
To construct a general retail commercial building, ''Save On Foods''.
To construct a gas bar canopy ("Shell" at Hays Ridge).
To construct a SHELL ONLY restaurant and health services building (CRU1 at the "Shoppes of Jagare Ridge"; restaurant has drive thru service). [2 - 2 Hr Demising Walls, 0 Bathrooms, 5 RTUs]