Nouvelles constructions et développements à Ellerslie, Edmonton
10
projets suivis
10
en progression
2026-04-27
dernière activité
En date du 2026-04-27, 10 projets de développement ont été examinés par le processus de permis de construction de la Ville d'Edmonton dans le secteur Ellerslie. 9 sont des constructions neuves et 10 sont en progression. Usages : 5 commercial, 4 institutionnel.
Activité récente
To construct Exterior Alterations (Move three trailers on the West Side (Removed by Oct 30/2027) and to obtain building permit for deck cover) to an existing Religious Assembly Building. ”Gurdwara Dukh Nivaran Sahib”
To move on-site 2 temporary trailers from February 19, 2025 to February 19, 2030 (20.7m x 7.3m modular trailer) to provide shelter for dogs "daycare" to an existing Residential Single Detached House site.
To construct a new commercial building (5 CRU's with one 2 HR and three 1 HR demising walls) - Ellerslie Gate Plaza (Bldg C) NOTE: SHELL only. CRU Tenant fit-up's NOT included and requires separate permits
To construct a new commercial building (9 CRU's with Two 2 HR and Three 1 HR demising walls) 10 RTUs, CRU Tenant fit-up's require separate permits - Ellerslie Gate Plaza (Bldg B)
To construct a multi-use commercial SHELL building (CRU 1 Restaurant with Drive-in Food Service, CRU 2-3 General Retail) 4 roof top units, 0 demising walls, 1 Hr rated Mechanical/Electrical room and 0 Washrooms - Alliance Bazaar Building #5.
Projets (10)
To construct Exterior Alterations (Move three trailers on the West Side (Removed by Oct 30/2027) and to obtain building permit for deck cover) to an existing Religious Assembly Building. ”Gurdwara Dukh Nivaran Sahib”
To move on-site 2 temporary trailers from February 19, 2025 to February 19, 2030 (20.7m x 7.3m modular trailer) to provide shelter for dogs "daycare" to an existing Residential Single Detached House site.
To construct a new commercial building (5 CRU's with one 2 HR and three 1 HR demising walls) - Ellerslie Gate Plaza (Bldg C) NOTE: SHELL only. CRU Tenant fit-up's NOT included and requires separate permits
To construct a new commercial building (9 CRU's with Two 2 HR and Three 1 HR demising walls) 10 RTUs, CRU Tenant fit-up's require separate permits - Ellerslie Gate Plaza (Bldg B)
To construct a multi-use commercial SHELL building (CRU 1 Restaurant with Drive-in Food Service, CRU 2-3 General Retail) 4 roof top units, 0 demising walls, 1 Hr rated Mechanical/Electrical room and 0 Washrooms - Alliance Bazaar Building #5.
To construct a multi-use commercial SHELL ONLY (CRU 1 & 2 Restaurant, CRU 3 General Retail) (Alliance Bazaar Building #4). 3 roof top units, 0 demising walls, 1 Hr rated Mechanical/Electrical room and 0 Washrooms.
To construct a Religious Assembly Building --(Hussaini Mosque).
To construct a multi use building SHELL ONLY (Mercantile/Business and Personal service/Assembly, w/ 27 RTUs) - Alliance Bazaar, building 1,2.
To construct a recreation building (gymnasium) - Canadian Ministries of Islamic Learning.
To construct a Child Care Services Use building (maximum 189 children/24 employees) (Treehouse Daycare)