Nouvelles constructions et développements à Chappelle Area, Edmonton
22
projets suivis
453
logements proposés
22
en progression
2026-09-21
dernière activité
En date du 2026-09-21, 22 projets de construction majeurs ont été autorisés par permis dans le secteur Chappelle Area, totalisant 453 logements. Le plus important : un projet résidentiel de 103 logements au 5370 Chappelle Road SW. 21 sont des constructions neuves. Usages : 8 résidentiel, 8 commercial, 1 mixte, 4 institutionnel.
Données actualisées le · Les données
Activité récente
To construct a new 2 bay commercial unit base building. Shell only. No demising walls, 2 - RTU included. Future tenant fit-ups require separate permits. Creekwood Chappelle Building C.
To construct a new one-story commercial building for future 10 CRU's (includes 10 RTUs). "Creekwood Chappelle Phase 5, Building E" NOTE: SHELL only. CRU tenant fit-up's and demising walls NOT included and requires separate permits.
To construct a Gas Bar Canopy structure - Chapelle Creekwood Esso.
To construct a stacked row house building (8 dwellings, units 63-70) with rear attached garages, balconies and unenclosed front porches - CHAPPELLE, bldg #8
To add three (3) new CSA A277 MODUS modular classroom attached to existing modular classrooms as part of main school and construct interior renovation to washroom 201. - Donald R. Getty
Projets (22)
To construct an Accessory Building (Waste & Recycling) - Creekwood Landing 1.
To construct a Structural Frame only for Residential Apartment building - Building 1000.
To construct an Accessory building.
To construct an Accessory Building (Waste & Recycling) - Creekwood Landing 2.
To construct a 62 dwelling apartment building (Chappelle Springs - Building C).
To construct a 39-dwelling unit 4 storey apartment building with 1 storey underground parkade
To construct a stacked row house building (8 dwellings, units 63-70) with rear attached garages, balconies and unenclosed front porches - CHAPPELLE, bldg #8
To construct a 10 Dwelling unit Row House (3 Storeys Stacked)
To construct a new 2 bay commercial unit base building. Shell only. No demising walls, 2 - RTU included. Future tenant fit-ups require separate permits. Creekwood Chappelle Building C.
To construct a new one-story commercial building for future 10 CRU's (includes 10 RTUs). "Creekwood Chappelle Phase 5, Building E" NOTE: SHELL only. CRU tenant fit-up's and demising walls NOT included and requires separate permits.
To construct a Gas Bar Canopy structure - Chapelle Creekwood Esso.
To add three (3) new CSA A277 MODUS modular classroom attached to existing modular classrooms as part of main school and construct interior renovation to washroom 201. - Donald R. Getty
To construct Interior Alterations (new 2HR FRR demising wall between CRU 111 and 112) in an existing commercial building (Elite Cardinal Landing Bldg A).
To construct an accessory building (move onsite 3 existing prefabricated modular units, to be connected as 1 building as classroom space) to a Public Education Service Building - Garth Worthington School (EPSB) NOTE: removal of the existing modular classroom units (from Constable Daniel Woodall School) is NOT included in the scope of this application and requires separate permits.
To construct a SHELL two storey building. (M&E for main building services not for devices or distribution). NOTE: Completion of base building and tenant fit-up requires additional permits.
To construct an Accessory building (waste / recycling collection building unheated)serving the two (2) existing apartment buildings -"Chappelle Waste & Recycling Building "-- completed without a permit.
To construct an Accessory Building on a Community Recreation Services lot. Community tool shed / greenhouse.
To construct a shell only, including the interior demising walls, of a single storey 4 unit Commercial building (includes RTU's) - Building B
To construct a shell commercial building - Building 4. General retail CRU#101-103, General Industrial (Recycle Depot) CRU#104-108. 1 Hour demising walls at Grid Line 3 and 4, no washrooms, 3 RTU's, 5 Unit heaters & 8 Gas Meters.
To construct a religious assembly building - Beulah Alliance Church.
To construct a mixed-use commercial building ("Chappelle Commercial Development, CRU F"; zoned for assembly, retail, and business/personal services occupancies). [7 - 2 Hr demising walls, 0 bathrooms, 16 RTUs, 8 GMs]
To construct an Assembly/Mercantile Shell Building.(7 demising walls, 9 RTU's)