NearbyBuildsEdmonton

Edmonton development roundup — February 2025

86
active filings
414
proposed units
86
approvals

In February 2025, 86 development applications were active in City of Edmonton's building-permit process, proposing a total of 414 housing units. 86 were approved or recommended. Every filing links to its official source document.

100, 10422 142 Street NW
To construct a social housing residential building with sleeping accommodations for 12 people (Edmonton 2 Spirit - Bldg #1) - E2S Supportive housing
12 unitsIssued
2025-02-10New — Commercial Finalpermit 5-539798205
To construct a stacked row house building (10 dwellings, units 1-10) with rear attached garages and unenclosed front porches - CHAP, building 1.
10 unitsIssued
2025-02-28New — Commercial Finalpermit 12-505567961
To construct a 4 Dwelling unit Row House with 4 secondary suites, uncovered deck and walkout Basement. (Policy B23-01)
8 unitsIssued
2025-02-28Building - New — Single, Semi-detached & Rowhousingpermit 2-488155718
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porch, rear uncovered deck, develop 4 secondary suites in the Basement.
8 unitsIssued
2025-02-28Building - New — Single, Semi-detached & Rowhousingpermit 2-535801657
To construct a 4-Dwelling Row House with front/side unclosed porches and to develop 4-Secondary Suites in the basement. (Policy B23-01)
8 unitsIssued
2025-02-27Building - New — Single, Semi-detached & Rowhousingpermit 2-514859572
To construct a Residential Use building in the form of a 4 Dwelling Row House with balcony (1.31m x 3.26m), and 4 secondary suites in basement and partially on main floor. Not to used as a Lodging House. (Policy B23-01)
8 unitsIssued
2025-02-27Building - New — Single, Semi-detached & Rowhousingpermit 2-524509400
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porches, fireplaces and to develop 3 Secondary suites in the Basements (Unit 1, 2 & 3), and Basement development on Unit 4 (NOT to be used as an additional Dwelling).
8 unitsIssued
2025-02-26Building - New — Single, Semi-detached & Rowhousingpermit 2-528436230
6837 176A Avenue NW
To construct a Residential Use building in the form of a 4 Dwelling Row House with 4 Secondary Suites, unenclosed front porches, and rear uncovered decks. (Policy B23-01)
8 unitsIssued
2025-02-25Building - New — Single, Semi-detached & Rowhousingpermit 2-562736060
To construct a Residential Use building in the form of a 4 Dwelling Row House with 4 unenclosed front porches, and 4 secondary suites in the basement.
8 unitsIssued
2025-02-21Building - New — Single, Semi-detached & Rowhousingpermit 2-526122577
To construct a stacked row house building (8 dwellings, units 47-54) with rear attached garages, balconies and unenclosed front porches - CHAPPELLE, bldg #6.
8 unitsIssued
2025-02-20New — Commercial Finalpermit 154-505567961
To construct a 4 Dwelling Multi-unit Housing building, with secondary suites under each main dwelling.
8 unitsIssued
2025-02-19Building - New — Single, Semi-detached & Rowhousingpermit 7-453871964
Bsmt1, 22315 88 Avenue NW
To construct a 4 Dwelling Row House with unenclosed front porches, and 4 Secondary Suites in the basements. And install Solar Panels Unit 1-4 (Policy B23-01) (9.9.4.4 sprinkler protected as per variance)
8 unitsIssued
2025-02-13Building - New — Single, Semi-detached & Rowhousingpermit 5-494686548
To construct a Residential Use building in the form of a 4 Dwelling Row House with an unenclosed front and rear porches and 4 Secondary Suites.
8 unitsIssued
2025-02-11Building - New — Single, Semi-detached & Rowhousingpermit 2-521543872
To construct a Residential Use building in the form of a 4 Dwelling Row House with a unenclosed front porches, and 4 Secondary Suites in the Basements.(Policy B23-01)
8 unitsIssued
2025-02-11Building - New — Single, Semi-detached & Rowhousingpermit 2-527859316
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porches, and to develop 4 Secondary Suites in the Basements. (Policy B23-01)
8 unitsIssued
2025-02-11Building - New — Single, Semi-detached & Rowhousingpermit 2-509833641
Bsmt53, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. UNITS 53/54/55/56. POLICY B23-01
8 unitsIssued
2025-02-11Building - New — Single, Semi-detached & Rowhousingpermit 31-494686548
Bsmt9, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 9-12 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 9-494686548
16, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 13-16 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 11-494686548
36, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 33-36 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 21-494686548
52, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. UNITS 49/50/51/52. POLICY B23-01
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 29-494686548
48, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. UNITS 45/46/47/48. POLICY B23-01
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 27-494686548
32, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 29-32 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 19-494686548
40, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. UNITS 37/38/39/40. POLICY B23-01
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 23-494686548
Bsmt5, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 5-8 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 7-494686548
60, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Units 57/58/59/60. POLICY B23-01
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 33-494686548
20, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 17-20 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 13-494686548
28, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 25-28 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 17-494686548
44, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. UNITS 41/42/43/44. POLICY B23-01
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 25-494686548
Bsmt21, 22315 88 Avenue NW
To construct a 4-Dwelling Row House with unenclosed front porches, to install solar photovoltaic system and to develop 4-Secondary Suites in the basements. Unit 21-24 (Policy B23-01)
8 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 15-494686548
To construct a 4 Dwelling Row House (Units 1/2/3/4) with an unenclosed front porch, 3 Secondary Suites in the Basement and 1 Basement development. POLICY B23-01
8 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 2-520480398
17, 13516 115 Avenue NW
To construct a 4 Dwelling Row House (Units 17 - 24) with unenclosed front porches, rear uncovered decks, and 4 Secondary Suites in the Basements. POLICY B23-01
8 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 13-517419754
9, 13516 115 Avenue NW
To construct a 4 Dwelling Row House (units 9-16) with unenclosed front porches, rear uncovered decks, and 4 Secondary Suites in the Basements. POLICY B23-01
8 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 16-517419754
1, 13516 115 Avenue NW
To construct a 4 Dwelling Row House (units 1-8) with unenclosed front porches, rear uncovered decks, and 4 Secondary Suites in the Basements. POLICY B23-01
8 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 11-517419754
To construct a stacked row house building (8 dwellings, units 39-46) with rear attached garages, balconies and unenclosed front porches - CHAP, bldg #5.
8 unitsIssued
2025-02-05New — Commercial Finalpermit 126-505567961
To construct a Residential Use 4 Dwelling Row House with 4 secondary suites. (Policy B23-01)
8 unitsIssued
2025-02-05Building - New — Single, Semi-detached & Rowhousingpermit 2-510202324
To construct a Residential Use building in the form of a 4 Dwelling Row House with unenclosed front porches and to develop 4 Secondary Suites in the Basements. (Policy B23-01)
8 unitsIssued
2025-02-04Building - New — Single, Semi-detached & Rowhousingpermit 2-516859122
To increase the number of Dwellings from 111 to 118 and to construct Interior Alterations on an existing Residential Use building. --Ashbourne Building Conversion--
7 unitsIssued
2025-02-28Add Suites to Multi-Dwelling — Commercial Finalpermit 3-491011552
To construct a Residential Use building in the form of a 3 Dwelling Row House with 3 Secondary Suites. (Policy B23-01)
6 unitsIssued
2025-02-27Building - New — Single, Semi-detached & Rowhousingpermit 8-528713269
To construct a 3-Dwelling Row House with unenclosed front porches and to develop 3 Secondary Suites in the basement. (Policy B23-01)
6 unitsIssued
2025-02-20Building - New — Single, Semi-detached & Rowhousingpermit 2-529609107
To construct a Residential Use building in the form of a 3 Dwelling Row House with 3 Secondary Suites. (Policy B23-01)
6 unitsIssued
2025-02-14Building - New — Single, Semi-detached & Rowhousingpermit 2-477107279
To construct a 6 Dwelling Row House with rear attached Garages, solar panels on units 67 and 68, balconies, and unenclosed front porches. (Block 13)
6 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 76-465119916
To construct a 6 Dwelling Row House with rear attached Garages, solar panels on units 31 and 32, and unenclosed front porches. (Block 4)
6 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 74-465119916
To construct a Residential Use building in the form of a 3 Dwelling Row House with unenclosed front porches, rear unenclosed deck and 3 secondary suites in the basements.
6 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 2-525182554
10314 147 Street NW
To construct a 3 Dwelling Row House (Units 10314, 10316, 10318) with unenclosed front porches and to develop 3 Secondary Suites in the Basements. POLICY B23-01.
6 unitsIssued
2025-02-06Building - New — Single, Semi-detached & Rowhousingpermit 2-508034915
To construct a Residential Use in the form of a 3 Dwelling Row House with unenclosed front porch(s), fireplaces, and to develop a Secondary Suites in the Basements.
6 unitsIssued
2025-02-05Building - New — Single, Semi-detached & Rowhousingpermit 2-503952080
4253 Kinglet Drive NW
To construct a Residential Use building in the form of a 3 Dwelling Row House with unenclosed front porches, rear uncovered decks, to develop 2 Secondary Suites in the basement (Lot 12 and 14), and a Basement Development (Not to used as an additional dwelling) (Lot 13).
5 unitsIssued
2025-02-25Building - New — Single, Semi-detached & Rowhousingpermit 2-566443113
1339 Keswick Drive SW
To construct Multi-unit Housing in the form of a 4 Dwelling Row House with unenclosed front porches, and rear uncovered decks.
4 unitsIssued
2025-02-26Building - New — Single, Semi-detached & Rowhousingpermit 2-558204471
60, 7110 Keswick Common SW
To construct a 4 Dwelling Row House with front attached Garages, unenclosed front porches and rear uncovered decks (Bldg #7, 4 units (60-63)).
4 unitsIssued
2025-02-19Building - New — Single, Semi-detached & Rowhousingpermit 58-500200180
52, 7110 Keswick Common SW
To construct a 4 Dwelling Row House with front attached Garages, unenclosed front porches and rear uncovered decks (Bldg #5, 4 units (52-55)).
4 unitsIssued
2025-02-19Building - New — Single, Semi-detached & Rowhousingpermit 54-500200180
56, 7110 Keswick Common SW
To construct a 4 Dwelling Row House with front attached Garages, unenclosed front porches and rear uncovered decks (Bldg #6, 4 units (56-59)).
4 unitsIssued
2025-02-18Building - New — Single, Semi-detached & Rowhousingpermit 56-500200180
To construct a Residential Use building in the form of Cluster Housing (Building E - units 10-13, 4 unit Row House with front attached Garages and unenclosed rear porches with balconies above).
4 unitsIssued
2025-02-12Building - New — Single, Semi-detached & Rowhousingpermit 14-472546661
455 Aster Drive NW
To construct a Residential Use building in the form of a 4 Dwelling Row House with an unenclosed front porch.
4 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 2-557128778
533 Aster Drive NW
To construct a Residential Use building in the form of a 4 Dwelling Row House with a rear attached Garage, drive under main floor Garage, unenclosed front porch and balcony.
4 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 2-558292138
471 Aster Drive NW
To construct a Residential Use building in the form of a 4 Dwelling Row House with an unenclosed front porch.
4 unitsIssued
2025-02-10Building - New — Single, Semi-detached & Rowhousingpermit 2-557871803
525 Aster Drive NW
To construct a Residential Use building in the form of a 4 Dwelling Row House with rear attached Garages, balconies, and unenclosed front porches. Units 525/527/529/531
4 unitsIssued
2025-02-07Building - New — Single, Semi-detached & Rowhousingpermit 2-558227918
37, 1009 Cy Becker Road NW
To construct a Residential Use Development in the form of Cluster Housing ( 4 Dwelling Row House , Building # 14, units 37 - 40) with unenclosed front porches and rear uncovered decks.
4 unitsIssued
2025-02-07Building - New — Single, Semi-detached & Rowhousingpermit 38-518565288
To construct a Residential Use building in the form of a 4 Dwelling Row House with front attached Garages, unenclosed front porches and rear uncovered decks.
4 unitsIssued
2025-02-05Building - New — Single, Semi-detached & Rowhousingpermit 206-187088640
463 Aster Drive NW
To construct a Residential Use building in the form of a 4 Dwelling Row House with an unenclosed front porch(es).
4 unitsIssued
2025-02-05Building - New — Single, Semi-detached & Rowhousingpermit 2-556157003
17672 69A Street NW
To construct a Residential Use building in the form of a 3 Dwelling Row House with a unenclosed front porches.
3 unitsIssued
2025-02-28Building - New — Single, Semi-detached & Rowhousingpermit 2-562317775
1333 Keswick Drive SW
To construct Multi-unit Housing in the form of a 3 Dwelling Row House with unenclosed front porches, and rear uncovered decks.
3 unitsIssued
2025-02-26Building - New — Single, Semi-detached & Rowhousingpermit 2-558537747
To construct a Multi-unit Housing Development in the form of a 3 Dwelling Row House with rear attached Garages, unenclosed front porches, front balconies and fireplaces.
3 unitsIssued
2025-02-25Building - New — Single, Semi-detached & Rowhousingpermit 2-562331515
To construct a Residential Use building in the form of a stacked multi-unit Backyard House (3 rental Dwellings without Garage, upper unit with balcony).
3 unitsIssued
2025-02-04New — Commercial Finalpermit 6-517535741
To move on-site 2 temporary trailers from February 19, 2025 to February 19, 2030 (20.7m x 7.3m modular trailer) to provide shelter for dogs "daycare" to an existing Residential Single Detached House site.
Issued
2025-02-28New — Commercial Finalpermit 3-531573534
To Construct a New Gas Bar Canopy.
Issued
2025-02-27New — Commercial Finalpermit 4-529591686
To construct an addition to a Minor Industrial Use building (enclose East and West crane ways), completed without permits.
Issued
2025-02-27Addition — Commercial Finalpermit 4-510011081
To construct a new 1 storey F2 storage building (SIP wall construction MagO wall panels) cold storage ONLY" commercial building (EXISTING WITHOUT PERMITS) - Temporary permit - Expires August 31, 2027 with lease agreement. BelVan Warehouse Building.
Issued
2025-02-25New — Commercial Finalpermit 5-465574130
To construct additions (sheds) and exterior alterations to two Industrial Use buildings. existing without permits.
Issued
2025-02-25Addition — Commercial Finalpermit 3-506682746
5705 Juchli Avenue NW
To construct a UNDERGROUND PARKADE ONLY for future residential buildings 3 & 4 --Arbutus Griesbach--
Issued
2025-02-25New — Commercial Finalpermit 6-520117016
To construct Interior Alterations (new 2HR FRR demising wall between CRU 111 and 112) in an existing commercial building (Elite Cardinal Landing Bldg A).
Issued
2025-02-24Addition — Commercial Finalpermit 47-434528734
To construct a new 1 story 3 CRU 463 m2 commercial building with one 1 HR and one 2 HR demising walls (Glenridding Bldg "C"). 4 RTUs. Tenant fit-ups not included requires separate permit applications
Issued
2025-02-24New — Commercial Finalpermit 5-507340453
To construct an UNDERGROUND PARKADE (2 levels)) only, for a future 6 storey apartment building. "Michener Park Active Adult Residences"
Issued
2025-02-21New — Commercial Finalpermit 6-525215829
To construct Interior and Exterior Alterations (fit-up for pharmacy - hospital use only) In the Basement of an existing hospital. --Cross Cancer Institute--
Issued
2025-02-21Interior Alterations — Commercial Finalpermit 1-535282738
To construct an addition to a General Industrial Use Building
Issued
2025-02-19Addition — Commercial Finalpermit 4-528205196
650 127 Street SW
To construct FOUNDATIONS AND FOOTINGS ONLY for the future Llew Lawrence Operations and Maintenance Facility Stage 1 as part of the Capital Line South Extension.
Issued
2025-02-14New — Commercial Finalpermit 14-458536108
To construct an 8-storey Public Education Building with a mezzanine, an Accessory Specialty Food Services Use on the main floor, and an underground parkade (parkade Permit) 463071239-041 - MacEwan School of Business. Alternative Solution - Interconnected Floorspace Revised April 14/2025. Moved approved Pedway from permit 463071239-014 to permit 463071239-011
Issued
2025-02-14New — Commercial Finalpermit 10-463060825
514 50 Street SW
To construct a 2 storey Child Care Services building (no demising walls, 2 RTU's) - Active Start Daycare - 506 children (Harvest Hills, bldg 17).
Issued
2025-02-14New — Commercial Finalpermit 5-504951323
To construct a new single storey industrial building (shell ONLY with no demising walls). Cornerstone Building E
Issued
2025-02-13New — Commercial Finalpermit 6-477248315
To construct Addition to Existing Building and construct Interior and Exterior Alterations. Engineered Air Edmonton
Issued
2025-02-11Addition — Commercial Finalpermit 5-518114620
To construct a 4-storey Indoor Self Storage building with Vehicle Support Service (Super Centre Self Storage & Car Wash Inc).
Issued
2025-02-11New — Commercial Finalpermit 6-486947062
To construct Exterior & Interior Alterations to an existing High rise podium. Manulife Place - Podium Repositioning phase 1.
Issued
2025-02-11Exterior Alterations — Commercial Finalpermit 7-510458082
5003 28 Street NW
To construct a 3 Storey Office Building (SHELL ONLY) 10 RTUs - Southeast Industrial (Building 6) NOTE: Tenant fit-up requires separate permit
Issued
2025-02-11New — Commercial Finalpermit 52-453084792
4802 118 Avenue NW
To construct a two storey Commercial Uses building (5 CRU on main floor and Office on 2nd floor). ** Shell Only interior fit ups require separate permits **
Issued
2025-02-11New — Commercial Finalpermit 8-506355854
510 50 Street SW
To construct a new Indoor Participant Recreation Service building (multi-use fitness facility with swimming pools) with an accessory Specialty Food Service - Movati Athletic, Harvest Hills.
Issued
2025-02-10New — Commercial Finalpermit 8-516043531
To construct FOOTINGS AND FOUNDATIONS/PARKADE ONLY for future apartment buildings - Vista Ridge (north and south blocks).
Issued
2025-02-06New — Commercial Finalpermit 6-515794727
To construct a new two storey commercial building (main floor F2 occupancy and 2nd level D occupancy) - Ambleside Integrated Services (AIS) Facility - City of Edmonton.
Issued
2025-02-03New — Commercial Finalpermit 5-502439887
Util, 20085 Lessard Road NW
To construct a new single storey multiple tenant (4 CRU's) commercial retail building (shell with two 2hr FRR demising wall on grid line 9 and 10) and 10 RTUs. - Edgemont Commercial CRU #5 Separate Permits required for CRU tenant fit-ups
Issued
2025-02-03New — Commercial Finalpermit 21-478604132

Other months

July 2026 (16)June 2026 (109)May 2026 (117)April 2026 (100)March 2026 (108)February 2026 (59)January 2026 (63)December 2025 (81)November 2025 (86)October 2025 (104)September 2025 (93)August 2025 (97)