9270 23 Avenue NW — development project
This commercial project (new construction) at 9270 23 Avenue NW, in the Parsons Industrial neighbourhood, has been the subject of 2 applications before City of Edmonton's building-permit process between 2024-12-12 and 2025-01-03. Estimated construction value: $1.8M. Status: advancing — latest status: Issued. Application types: New — Commercial Final.
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (2)
2025-01-03 — New — Commercial Final
· Issued (5-506138915)
To construct a single storey 5 CRU commercial building (base building includes 4 - 2 HR demising walls, 6 RTU's) - District 23 (Bldg 4) CRU Tenant fit-up's requires separate permits
2024-12-12 — New — Commercial Final
· Issued (7-506137938)
To construct a single storey commercial building (A2 occupancy with Drive-Through Services) "District 23 (Bldg 3 Shell Only)" NOTE: CRU Tenant fit-up requires separate permits
Other projects in Parsons Industrial
To construct a religious assembly building WORK STARTED WITHOUT PERMITS - Masjid Al-Fatima.
To construct an addition to a general industrial building ("Andarr Electrical"; addition is warehouse and SHELL office area. Interior of office requires separate permit).
To construct an addition (1557sq.m.) to a General Industrial building - Noodle Factory - production area.
To construct a new 2 storey commercial building for an 13 bay automotive repair shop, with offices located on the main & 2nd floor. (Parsons Plaza)
To construct a Liquor Store building, accessory to an existing Warehouse Sales building and to construct exterior alterations (reconfigure parking lot)
To construct an accessory industrial building (storage facility) - Coca-Cola.
To construct a minor impact utility structure at AltasGas Edmonton Ethane Plant (size 3.3m x 4 m; built to accommodate electrical PLC, MCC and recifine panel).
To construct an Addition (selective demolition, piling installation, excavation with duct bank support, and concrete works. Then, masonry, steel framing, roofing, and interior tie-ins will follow.) to an existing building; “Epcor”