5050 Gateway Boulevard NW — development project
This commercial project (new construction) at 5050 Gateway Boulevard NW, in the Calgary Trail North neighbourhood, has been the subject of 1 application before City of Edmonton's building-permit process at its 2023-01-09 meeting. Estimated construction value: $2.0M. Status: advancing — latest status: Issued. Application type: New — Commercial Final.
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (1)
2023-01-09 — New — Commercial Final
· Issued (8-413551353)
To construct a General Retail Store building ( Shell Only) and to revise and re-configure a portion of the existing vehicular parking layout. With 7 RTU and one roof top refrigeration unit. No demising walls with one sprinkler room and one electrical room one receiving area.
Other projects in Calgary Trail North
To construct a new commercial building (shell ONLY). (2 RTU's, 0 demising walls) --"Ever Square - Building A2"-- NOTE: Tenant fit-up requires separate permit
To construct a Restaurant with Drive-in Food Services (Krispy Kreme Doughnuts), 2 RTUs and 1 MUA
To construct a new 1 storey, 931 m2 , A2 occupancy, commercial building (shell ONLY - demising walls NOT included).- Ever Square - Building B NOTE: Tenant fit-up requires separate permit
To construct an Addition, Interior and Exterior alterations to an existing retail building - New 2 Storey subsidiary building separated by a 4Hr firewall - "SUNDANCE SKI SHOP" - demolish a portion of existing building, Solar panel installation on roof. Revised for 4Hr New Firewall Extension (Cap)
To construct a two-storey (main floor future Retail occupancy and second floor future daycare & office occupancy) commercial building. (SHELL only, Sprinklered, 32 RTU's, 0 washrooms, main floor lobby partition walls, 3 - 1HR demising wall main floor, 2- 2HR demising walls second floor, second floor public corridor, future daycare 2HR demising wall & stairwell walls) --Alliance Centre Gateway-- NOTE: CRU Tenant fit-up and tenant demising walls NOT included and requires separate permits
To construct an Assembly use building, ''Building 2''. Shell only, one demising wall on grid line 4 rated 1 hour, 5 RTU's.
To construct an Assembly Restaurant use building with outdoor patio and a dual-lane drive-through, building 1, ''PETER'S DRIVE-IN''.
To construct an Addition to Existing Building, Exterior Alteration to an Existing Building; (Adding 3 rooftop and Antenna structure enclosed behind a Shroud on top of the Penthouse Roof level 3) --W6078 Weber Center Relocate--