This institutional project (new construction) at 365 Windermere Road NW, in the Windermere neighbourhood, has been the subject of 10 applications before City of Edmonton's building-permit process between 2015-06-30 and 2026-06-17. Estimated construction value: $14.1M. Status: advancing — latest status: Issued. Application types: New — Commercial Final, Addition — Commercial Final.
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (10)
2026-06-17 — Addition — Commercial Final
· Issued (3-644406447)
To construct an addition, (1) Modular unit classroom (CSA-A277-16) to the (3) existing modular classrooms on site and to construct interior alterations (adding washrooms inside the core school) to the main school building (Constable Daniel Woodall School).
2025-03-25 — Addition — Commercial Final
· Issued (4-493766088)
To Installing 1 (CSA-A277) modular unit classroom to an existing cluster on site, with some minor site modifications to accommodate the new classroom unit on site - Constable Daniel Woodall School.
2023-07-26 — New — Commercial Final
· Issued (6-456990047)
To install two CSA-A277 modular classroom units (detached from the existing school), located at an existing public school site - Constable Daniel Woodall School.
2022-05-06 — Addition — Commercial Final
· Issued (3-417032037)
To construct an addition to a school (2 portable classrooms). "Constable Daniel Woodall School"
2021-07-08 — Addition — Commercial Final
· Issued (3-380839143)
To add two CSA A277-16 modular pre-fabricated classroom units to the existing school as well as relocating the Vestibule pre-fabricated unit to the end of the new units - Daniel Woodall School.
2019-10-09 — Addition — Commercial Final
· Issued (2-311482676)
To move on and attach one (1) CSA A277-16 modular classroom to existing seven (7) modular classrooms in junior high/elementary school - ST. JOHN XXIII Elementary/Junior High School
2018-10-12 — Addition — Commercial Final
· Issued (9-251510965)
To construct an addition (two portable classrooms)--install and connect one (1) Modular A units and one (1) Modular B unit to existing units - St. John XXIII
2017-12-13 — Addition — Commercial Final
· Issued (1-251510965)
To construct an addition (three portable classrooms) to an existing Public School Service building St. John XXIII Catholic School and to construct exterior alterations (relocate existing vestibule and exterior stairs)
2016-09-22 — New — Commercial Final
· Issued (3-181647903)
To construct a Public Education Services Use building with 2- 2hour rated firewalls AND 8 school portables at North firewall AND 4 school portables at East firewall (Windermere K-6 Public School).
2015-06-30 — New — Commercial Final
· Issued (3-159561054)
To construct a school building - Windermere Edmonton Catholic School. 2hr fire walls on either end separating the Modulars and the main building.
Other projects in Windermere
To construct a 5 story mulit use residential/commercial building on an existing parkade - LUX at Upper Windermere. 2 hour floor separations provided.
To construct an Apartment Building with an underground Parking Garage (BLDG A - 85 units) as part of a two building, 171 unit project.
To construct a 4 storey apartment building on top of an existing parking garage.
To construct a Residential Use building in the form of a 10 Dwelling Row House (Building 7, units 41-50) with unenclosed front porches, rear attached Garages, and balconies.
To construct a Residential Use development in the form of Cluster Housing (Block 1 (units 1-6)), 6 Dwellings Row House with rear attached Garage(s) and unenclosed front porch(es).
To construct a 6 Unit Row House (BLDG 7) with front attached garages, and 2nd floor balconies
To construct an 8 Units Multi Row House (BLDG 5, Langdale) with front attached garages, second floor balconies
To construct 8 Dwellings of Stacked Row Housing (building - 4).