NearbyBuildsEdmonton

10455 81 Avenue NW — development project

$16.9Mindustrialadvancing

This industrial project (new construction) at 10455 81 Avenue NW, in the Queen Alexandra neighbourhood, has been the subject of 4 applications before City of Edmonton's building-permit process between 2023-06-20 and 2024-05-24. Estimated construction value: $16.9M. Status: advancing — latest status: Issued. Application types: New — Commercial Final, Excavation — Commercial Final.

Location & nearby projects

● this project · ○ nearby projects — click a dot to open its page

Filing history (4)

2024-05-24 — New — Commercial Final · Issued (32-364526024)
To construct a 1-Storey commercial building (with demising walls and public corridor) - SHELL ONLY--"HAT @ QUEEN ALEXANDRA, PHASE 1 - COMMERCIAL EAST"--
2023-12-12 — New — Commercial Final · Issued (19-364526024)
To construct a FOOTING AND FOUNDATION/PARKADE (Levels: P1,P2,P3 ) for a future tower and mixed-use buildings--" HAT @ Queen Alexandra, Phase.
2023-07-31 — Excavation — Commercial Final · Issued (7-364526024)
To construct SHORING AND EXCAVATION ONLY for future apartment buildings (Tower A and Tower B only) - HAT at Old Strathcona, phase 1 --Refer to Encroachment 364536438-009 onto City Right-of-Way (tie back anchors for shoring).-
2023-06-20 — New — Commercial Final · Issued (10-364526024)
To install soldier piles and excavate to a depth of 2.4m ONLY - HAT @ Old Strathcona. --Refer to Encroachment 364536438-009 onto City Right-of-Way

Other projects in Queen Alexandra

To construct a mixed-use tower building (165 dwelling unit 21- Storey Tower over a parkade) and complete an underground parkade (F&F 364536438-046) " HAT @ QUEEN ALEXANDRA, PARKADE AND TOWER A"
165 units$35.2Mmixed-useadvancing
New — Commercial Finallatest activity 2024-06-061 filing(s) project page permit 25-364526024
To construct General Retail / Apartment House buildings with underground parkades (site 4 building has 98 Apartment House Dwellings above main floor General Retail) - Southpark on Whyte, site 4.
98 units$16.5Mmixed-useadvancing
New — Commercial Finallatest activity 2020-05-111 filing(s) project page permit 16-254414835
To construct a 43 Dwelling Multi-unit Housing (apartment) building with an underground parkade - Queen Alexander multifamily.
43 units$7.4Mresidentialadvancing
New — Commercial Finallatest activity 2022-11-031 filing(s) project page permit 7-384493013
To construct a 4 storey rental apartment building (20 dwellings between main to 4th floor) and 3 dwellings along with storage area, utility rooms, and an amenity room in the basement level. - Aria in Queen Alexandra
23 units$4.1Mresidentialadvancing
New — Commercial Finallatest activity 2025-03-281 filing(s) project page permit 7-503400138
To construct Exterior Alterations (install Rooftop Solar Panel system) on an existing Multi-unit Housing Apartment building - Aria in Queen Alexandra
23 units$67Kresidentialadvancing
Exterior Alterations — Commercial Finallatest activity 2025-10-081 filing(s) project page permit 2-629991308
To construct a Residential Use 4 Dwelling Row House with 4 secondary suites. POLICY B23-01
21 units$2.7Mresidentialadvancing
New — Commercial Final, Building - New — Single, Semi-detached & Rowhousinglatest activity 2024-12-112 filing(s) project page permit 2-508225034
To construct interior alterations to a mixed-Use building. Converting a portion of the second floor from Office to Residential Use (13 dwelling units with 8 having lofts.)The number of Dwellings in the building will increase from 95 to 108. "Raymond Block"
13 units$1.9Mresidentialadvancing
Convert Non-Res to Residential — Commercial Finallatest activity 2023-05-021 filing(s) project page permit 5-458412610
To construct a Residential Use building in the form of a 5 Dwelling Row House with 5 Secondary Suites.(Policy B23-01)(Steel Frame Construction)
10 units$802Kresidentialadvancing
Building - New — Single, Semi-detached & Rowhousinglatest activity 2025-11-121 filing(s) project page permit 3-530386753